It needs to be done after the winter. I will supply all the materials. The facia boards will also need to be replaced when the house gets painted if you can assist with that as well it will count in your favour. House only has 3 sides as the garages are adjacent.
Regrouting flat roof and dealing with waterproof material Polishing wooden windows and garage door Filling cracks Painting Replacing warped laminates board
Paint is OK but needs a new overcoat. A few areas needing poly filling.
I need: +/- 10 pictures hung; washer/dryer properly installed; some furniture assembled; a plug point changed and plug covers put on 2 plug points; a bathroom mirror re-hung; some kitchen hooks put up; a plug extension properly (firmly installed); my balcony weather-proofed; a laminate shelf installed in the kitchen; glass doors and window cleaned. If you can help much appreciated
Just need to have a bit of a trim and clean. No grass to cut its already to short.
Replace new light bulb in the kitchen and lounge. Remove cover for the gyser.
Concrete Edging to plant beds
Paint inside of substation. Walls are pva currently. Need to paint with plascon enamel g3 cream