
Good day, I would like an idea of building costs per m² in Kranspoort Vakansiedorp for a modern house in and ? Im looking to build about m² and includes a large patio (deck) with a braai and basin. Main bedroom with dresser, bath, shower, toilet and basin. 2nd & 3rd bedroom share a bathroom with shower, toilet and basin. Storeroom with shower, toilet and basin accessible from patio (deck). Kitchen, pantry, scullery Open plan lounge and kitchen area High ceilings Large double garage attached to the house, storeroom and toilet with basin. Driveway and 1 m Apron around the dwelling All kitchen, bedroom, etc.. with cupboards / wardrobes etc. Tiled roof with gutters Gas stove, electric geysers All quality finishes etc etc Kind regards
Hi, i am looking fir best price on a budget to build a home of approximately to sqm. I am yet to purchase a plot in the port alfred area which i should do in January. I am doing home workon prices and want to see which will suite my needs best. Would like to get in touch with companies in that area ti see who i can partner with best and which will be cheapest and beat option for me.
Due plafon het uitgeval a.g.v. ń probleem op die dak wat veroorsaak dat reënwater sois ń waterval instroom. Assessor nou agtergekom dat balke in dak al heeltemaal verweer het a.g v. langdurige stortreën en waarvan ons onbewus was.Gevaar dat ondersteunende balke gaan breek en veroorsaak dat alles ineenstort.Het tydelike stut prakseer maar moet absoluut dringend herstel word. Balke binne in dak gaan vervang moet word en veranderinge gaan aan die struktuur gemaak moet word.
Built with whichever is more affordable ie. Block or Prefab: 6m long × 3.5m width cottage in our backyard. With an indoor Bathroom ie. a brick wall separating where the toilet & shower will be situated directly alongside each other with 2x windows included herein. Then 1 x large sliding door which has its own 2x windows which will serve as The Entrance.
KITCHEN 1. Stripping out existing tiles in kitchen. 2. Removing existing kitchen cupboards. 3. waterproofing kitchen wall. 4. Installing new kitchen cupboards with new sink and taps 5. Installing wall unit. 6. Installing wall tiles 7. Plastering and painting existing wall. PASSAGE 1. Waterproof wall. 2. Tile. BATHROOM 1. Install new bathroom entrance door and frame. 2. Install a new shower door 3. Install new shower taps 4. Remove 2 tiles behind the toilet pan, waterproof wall, and put back tiles 5. Change a leaking toilet pipe. 6. Remove, wash hand basin 7. Build a brick and lintel cupboard with timber door, for a new wash hand basin to rest on. ENSUITE 1. Change a leaking toilet pipe. GENERAL 1. Electrical Certificate of Compliance. This will include ensuring all plug points and light fittings are in working order.
- double storey house - 4 car garage (deep garage, not long garage) - 3 bedrooms upstairs (Main bedroom to have ensuite and walk-in closet) - upstairs 'pajama lounge' - 1 family bathroom upstairs - 1 guest toilet downstairs - 1 guest bedroom with ensuite downstairs - 1 study downstairs - open plan lounge / dining room / kitchen with panty & scullery - big stacker doors from living / dining room onto a deck / stoep with a rectangular pool. - perimeter wall for sqm property
Fire pit destination. I need walls built to outline the fire pit. One wall must be a double wall up to waist height, and then two flower boxes on the corners of the 2nd wall, waist height. A window will go into the third wall, which will be about 3m high. Then, I need a wall built at the end of our patio with a door in it. I am looking for reasonable prices as we will supply the bricks and cement.
I have a shack that I would like you to fix in Durban, KwaMashu. The shack is leaning on one side and I would like you to straighten it. I would also like you to change the roof and install new sheets of corrugated iron (7 sheets), a burglar gate on the door and on the small window. I request you to take the old sheets of corrugated iron with you. Some planks are falling off, please hammer them back into place and male the whole shack straight and stable with no holes. We are not rebuilding it, rather fixing it. The process should therefore take a couple of hours.
I would like to get a qoute for the construction for a mini shopping complex with 3 retail stores and 4 offices and a standalone structure for restaurants like kfc with drive thru. Retail stores m² m² m² Office space 2x 36m² 2x 49m² 1x 30m² Restaurant with drive thru 2x m² Pavement and parking area with capacity of cars
Building three homes on a stand in Mosselbay. A. Container 1x 12m2: 1. 1 x bedroom on left with en-suite: bath and toilet 2. 1 x bedroom on right with ensuite: shower and toilet 3. Entrance open plan kitchen/lounge B. Container 2 (the 12m2) to be the same as container 1 except both rooms to have a shower instead of bath. C. Container 3 (the 6m2) 1 bedroom with small shower in en-suite Services: Water, electricity, sewage connections, prepare stand that is currently on a slope Finishings: -black aluminum windows -sliding door for front -stable type back door -All finishings to be in white -Two x 12m containers to be placed in L- shape and 6m2 container to be place on side of container 1 to form a U shape