I need to modernize the house. It is currently a 3 bedroom house. Would like to convert the front bedroom into a dining room, break down about 2walls to have a much more open spaced(lounge,dining room and kitchen) Also need 1 more bedroom to be build and the entire bathroom to be converted in something spectacular. also needs garage and boundary walls to be replaced. all windows will be replaced by aluminum windows together with front door.
Good day, we are waiting to finalize transaction of the old house without any wall. we need a swimming pool, boundary wall, to add bedroom on top for space. we need to add an extra 2bedrooms flat let. the pace is square meters. You can email me. We need also to know who can do the work sooner and to get pay later, how much can the deposit be to start the work. we need to have a quote to know if we can start sooner or later when we have enough.
Hello, we currently have a 3 bedroom house with 1 full bathroom, a lounge + kitchen. I would like to extend into a double story house, with a total of 4 bedrooms 3.5 bathrooms with the (2 bathrooms being ensuite), double garage, a kitchen, a dining area, a lounge, Pajama Lounge. I have attached 2 pictures. 1 being our current house, 2nd picture it's a rough sketch of the new project
Cottage 45,25 Square M - 1 Shower, 1 Basin, 1 Toilet Scullery 9,87 Square M - 1 Double Sink and dishwasher outlet and tap Laundry 7,47 Square M - Washing machine outlet with tap Garage 43,85 Square M - Double Mono pitch roof. Floating foundation, already compacted raised surface, no concrete yet, steel for foundation already on site
Hi Have a loft townhouse - interior higher ceiling with cornicing - we have been trying to painting do bit by bit but this is just taking too long givenOI now work from home full time nee clean and efficient and to be finished in shortest space of time - what s the average time to paint an interior town house
Good day The patio and entrance need to be completed, the staircase need attention and frame need to be installed and clading to be done. Fire place need to be finish with litels, bathroom need new plumbing and to be retailed after plumbing is repaired. Kitchen tiles on wall. Hall way to be tiled. House need to be painted inside outside roof and window frames. Driveway need to be change and carport need to be moved to next to house and not in front.
Shop fitting team that can cost on a project. Renovation for a commercial store. The project will shortly go ahead. The team should be able to finish project from start to finish, have contactable references and work references to present. We are looking for a one stop team that is professional and reliable to work with.
Our house has burned down. And we need to rebuild or get alternative housing on the property. We need a 6 bedroom house, with a kitchen and bathroom. No lounge. Bedroom sizes should all be the same 4m X 4m and the 2 bathrooms 2m X 4m and kitchen should be 4m X 10m. Please will you quote me on this.
Dear Sirs As previously advised we wish to constructions an off street parking area at a private home - this will require excavation work of +-- 60sm ( max depth from 1.2 metres graduated down to street level) wall retention, and the construction of a 'T' shaped carport footprint. We also wish to construct a single garage in the driveway. Free quotations will be appreciated. Regards IVOR WALDECK 9 Manson Road, Newlands
I would like to convert our garage into a room that doubles as a home office/gym. i.e. home office during the day, gym in the evening. The idea is to end up with one large room after the following has been done: 1. Seal off the garage door 2. Add a frosted window to the sealed garage door that opens (for fresh air) 3. Add 2 large windows and a door on the adjacent wall Outside the garage is a covered open parking which I would also like to convert to a closed parking as follows: 1. Add a large gate to make it a closed parking 2. Add metal bars on top of the adjacent durawall similar to the ones on the opposite wall