I need to build the log house. I have plans in the work.
I need you to asses the condition of the roof and make recommendations if I can repair the roof or whether it need to be replaced. It is the roof of our boiler house that has multiple leaks.The site is in La Belle road Stikland at Winelands Pork. Thanks.
Double story..3 bedroom, 2 bathrooms, and a study..open plan dining, kitchen and lounge... seperate sculary..double garage with a small gym. Domestic room. And then a grandad cottage linked to the main house... 1 bedroom,bathroom,lounge, kitchen. the plans are in the making.
Need concrete poles only as I will be using wire fencing please.
I want to roof an existing patio with clear IBR
Addition of two rooms and a verandah room size 4*4m per room. Plans are in the process...
Good day. I recently bought a property in Gansbaai and would like to construct a steel frame, double-storey, simple and cost-effective house. The plans are in the works. - No garages required, - 3 bedrooms, 2 bathrooms - ground floor, - Kitchen and lounge must be on 1 st floor, - Open plan, - Cost effective building (steel frame, container, modular etc). Thank you,