Require a carport structure to be erected next to a braai room in my backyard. Material (steel sheets, steel lipped channel purlins, steel flashing and steel poles) are on site. The area to be covered is 6.25 x 3.45. The contractor must be able to erect steel carports, have a welder as part of his team and have power tools to cut steel purlins, steel sheet and steel poles. Roof structure requires welding.
Good day, I’m looking for a quote to remodel two bathrooms, where I want to install a new bathtub, double vanity and toilet and other accessories. In the main bathroom, I would like to extend the bathroom by demolishing the staff quarter in the back about 3 x 2 m. I don’t have the building plans as yet.
It is a two bedroomed house with a bathroom and open-plan kitchen and sitting room area. The alterations that would like to do is add two bedrooms. Have a master suit with with ensuit bathroom and dress area , add a guest toilet and an outside toilet, add two bedrooms , a pantry, or spacious pantry cupboard make a space for a laundry room and add a dining room with patio and garage
Good day, we have a plot in mind that we may consider purchasing. The erf size is square meters. The prototype/house-ground gross area is .32square meters.. We would like estimates for costing as a guideline as to what it will cost to build. We looking at a 3bedroom, 2bathroom, open plan kitchen lounge/dining room and garage.
Good day I live in a rural area Klipfontein mission Station. Land is undeveloped, there are some brick houses, Wendy houses but mainly zinc houses. I live in a house made off zinc, between - sqms. My company is offering funding for housing assistance but I need a quote for building material which could be for brick, zinc, prefabricated panels or a wooden house. My company will then approve one of the quotes for the work to be done. No plans will be required as this is land owner based dwellings. Your assistance would be much appreciated.
Double carport for 2 cars attached to the double garage with x 2 poles and gutter, IBR steel roof. It must match the carports in the Complex. The carport has been approved by the Complex Body Corporate. Once the quote is received, I will make a decision and ask for the Carports to be done. Currently my vehicle does not fit into the garage and that is the need for the Carports. I am in Elarduspark, Pretoria East.
Ground floor: an entrance patio that leads to the kitchen and a formal lounge that has a patio, then there’s a passage and when you enter the passage on the right there are stairs and next to the stairs there’s a bathroom and on the left there’s a dining room, going down the passage there’s bedroom 1 and 2, and at the end of the passage there’s a master bedroom with an en-suite and a patio, next to it there’s a garage. First floor: going up the stairs on you’ll end up on a passage facing bedroom 3, on the right of bedroom 3 there’s a pyjama lounge with a balcony, on the left of bedroom 3 there’s bedroom 4, opposite bedroom 4 there’s the study and between the study and the stairs there’s a bathroom. Down the passage, there’s a master bedroom with a master en-suite and between them, there’s a walk-in closet. This is my ideal house. I need a professional to execute it for me. Thank you
Good day I'm looking to do a full remodel of the bathroom remove the bath and relocate the shower as walk in, retile and paint, remodel the kitchen and redo flooring from tile to vinyl. The painting will also be required throughout. Please feel free to contact me so that we discuss this further. Thank you
I'm looking to extend 2 areas on my existing home: 1. New living room/playroom, adjoining the existing dining room (approx 18sqm) 2. Small lateral extension to existing garage to accommodate a golf cart (approx 11sqm) Also to include: The stormwater drainage system and gas fireplace (as per attached approved plans) Builders need to be NHBRC approved
The water is getting under the belcony tiles which has caused dampnest of my wall and the paint is pealing off. It's only 6sqm the tiles has to be removed, and torch-on bitumen applied then re-tiled. I want it done as soon as the walls and the belcony has dried completely. Because the last guy that did it said it would last 10 years and it's not even 6, the second picture is to show the state of the walls directly below the belcony. Apologies for my tone but I'm drive texting I won't have time later to do this. But you can send me the qoutes incase I'm unable to answer when you call as my days are usually extreme. Thanks so much for your time.