Hi, we are planning to build a vacation home we would use up to 6 months a year on our property in residential area of Grabouw. We want up to sqm for two bedroom (25sqm/15sqm), one with ensuite bathroom, open plan kitchen living room, terrace, guest bathroom. Conservancy Tank and council water is available on site. In case of questions please use my mail address. Thank you and kind Regards
I have a 2 bedroom sectional title house, with kitchen, lounge and bathroom . I am adding a master bedroom with another bathroom. A lounge, enclosed entertainment area with built-in braai, skylight. Also adding a scullery new bathroom, and 3rd bedroom moving to the back. Adding a storage in the carport.
I would like to build residential units of bachelor flats, one bedroom and two bedrooms in Bethanie for the miners and low-to-medium earning workers around there. Total units should be 16 on the property purchased. Units must include basic facility needs such as a toilet/bathroom in each. The least amount of space should be used to construct each unit, with parking and a lapa/play area facility on the premises.
I want to completely renovate my house. I have a facebrick house that I bought without doing a proper home inspection. A lot of work needs to be done. 1. I want to build a new boundary wall 2. Pave the yard and landscape the garden 3. Resurface the pool 4. Get rid of some trees 5. Install new garage doors 6. Renovate all bathrooms 7. Dress the exterior walls 8. Install new bedroom wardrobes 9. Renovate the kitchen
Replacements 1. Supply and install front flush cistern mechanism 2. Supply and install 15mm OXFI compression straight female coupler 3. Supply and install 15x15mm angle regulating valve 4. Supply and install FxF 15x braided connector 5. Supply and install new toilet seat cover 6. Supply and install bath mixer 7. Supply and install tiles for back splash (5m2) 8. Supply and install basin mixer taps 9. Cut wall to locate leak in the wall, replace 3,2m water Supply pipe and replace wall tiles (3m2) 10. Supply and install hand wash basin
We have a french drain that overflows with all the rain. Had it pumped out but didn’t help. Can connect to main sewerage system but have to pump it upwards. We would like to look at other options..maybe install a watertank that can collect the water from the washing machine and water used in doggy parlour in flat at the back of the house.
I am replacing two toilets and one bathroom basin cupboard. So three replacements in total. All the items are already purchased. In other words, I have the two toilets with their mechanisms, toilet wax, and seats, as well as the bathroom basin and cupboard with the easy trap waste trap. Note, that I do not have cement for the toilets.
I have the plans but they still need to be submitted to council. I have recently bought a plot in De Rust, where I would like to build a 3 bedroom 2 bathroom home. Around sqm. I am going to be completely off grid and want someone that can integrate solar electricity and water collection systems into the build. I want a very simple and elegant build, open plan. I have a strict budget to stick to and will be building through means of a building loan through the bank. I am ideally looking for a turn key solution and want to avoid having to sub contract too much of the work. Thank you in advance for your quote.
The current house inside walls must be removed to create one big open plan. The roof re structured. The current garage and outbuildings must be converted into a one bedroom flatlet with small kitchen. A workshop will be added to this at the back. New addition with a TV room and three ensuite bedrooms will be build onto the current house. Attached find current house plans as well as a plan for the new project. The specifications are as follows: Cemcrete or relevant floor, no floor tiles. Structure build with light clay stocks to be washed and sealed with limited plaster and paint work. Open roof trusses painted white. No solar or electrical geyser only Gas geysers for all bathrooms and kitchen. Gas stove for main house kitchen. No stove for flatlet. Covered patio. Windows to specifications. Lights and fittings to specifications. No baths for the 4 bathrooms only showers.
I would like to build a house on a 1 hectare lot. The smart home will have floor-to-ceiling windows comprising of 6 bedrooms, 7 bathrooms, 4 car garage, study, home cinema, 2 living areas, a large swimming pool with Jacuzzi connected, pool house with a bar. Furthermore, staff quarters building shall be detached from the house which will form part of a 2 bedroom guest house with a big 4 car garage to store additional cars