Advice & quotation for full installation. I don’t know how many AC's I will need. Have quite a large house so need professional advice. My house has an approximate floor area of m2 downstairs & an open mezzanine of about 70m2. Half the downstairs & the full upstairs are open plan. The other is normal rooms.
Dear Sirs, Please provide a quote on Labour Rates for the following works on a refurbishment contract project. Removal of Old Reticulation Lines Installation of New Internal Reticulation Lines Installation of 1st Fix, 2nd Fix New Shower Lines New Toilets New Vanities Kitchen Sink Hydroboils Gesyers New Drainage Regards
Please quote 2 x units 60 m2 each on same stand. Face brick. 15 degree flat roof zinc. Aluminium windows and doors. concrete floors polished. tiled bathroom walls. Open shower flat on floor. Vanity and toilet. Plastered inside walls. Plastered ceilings. Down lighters. Electricity change over switch for generator. Covered patio. Gas hob 4 plate no oven. Wooden kitchen units, granite tops. Plumbing to connect gas geyser. will need to chat around finishes. I need a quote for my budget to present.
I bought a townhouse in a complex and there are two bathrooms and the kitchen to be renovated. I want the tiling, taps etc. to be removed completely and replaced with whole new designs, this will be for the bathrooms and kitchen. I will then finally need the entire inside of the house to be painted. I am not sure at all about the total sqm of the house. Would need someone to advise.
Seeking a comprehensive renovation project, including: Kitchen Renovation: Full remodel to modernize and enhance functionality. Bathroom Updates: Overhaul of existing full bathroom, redo of the guest bathroom. En-Suites: Addition of en-suites to both master and guest bedrooms. Open Concept: Exploring options to open up living spaces for a more interconnected feel. Potential Extension: Considering an extension at the back of the house.
I want a two bedroom house built. a lounge that is 9 square meter. A stair case from the lounge to lead to kitchen, bedrooms and toilet / bathroom. Stair case can be 10 steps up. Upstairs a kitchen that is 3 square meter, two bedrooms each 3 square meter each. bathroom 3 square meter separate toilet 2 square meter. See attachment to view what the design should be like
Labour only: BATHROOM 1: 0,8 x 2,6m Drywall walls and cement floor - all plumbing already done. Build shower wall and floor (1 brick high) Install sink Install toilet Paint sealer over drywall Conceal 40mm waste pipe along wall Tile floor and walls (2,5 high) Install brandering, new ceiling and cornice Fit light Toilet: 0,8 x 1,8m Tile floor Sand and paint burglar bars Install cornice Bathroom 2 : 2,6 x 1,7m Re-do everything, currently tiled Remove all fixtures and fittings Install new sink and cabinet Install new bath Install new shower Tile floor and walls Sand and paint bathroom cabinet and burglar bars Install cornice (ceiling already done) Install 4mm nutec board on existing walls Kitchen: 2,6 x 4,5m Remove all cabinets Remove floor tiles Tile floor Tile walls above new counters +/- 0,5m high Remove 2m asbestos wall Sand and paint burglar bars Outside Install IBR sink on existing carport 8 x 3m Install barge board on roof +/- 20m
We would like to have a boundary wall built. Facebrick foundation rows with galvanized panels between brick pillars. Two motorized gates: 1 single existing plus 1 double to be supplied with both motors to be supplied. Ideally we would like to reuse the bricks we have in other walls & braai that are to be removed.
We have more than 10 houses in one yard where orphaned children live. Some of the houses are heavuly damaged due to the rocky foundation and some need repairs. The health inspection recommended evacuation of the children. We want to repair the ones not heavuly damaged so the centre cannot be shutdown
Renovation of bathroom and kitchen. Remove bath tub to make space for walk in shower. New wash basin new toilet. New wall tiles. New floor tiles. Paint ceiling white. Fit new modern taps for basin and shower. Kitchen: Remove all wall and floor tiles and replace with new tiles. Bedroom: Repair 1x Aluminum bedroom window frame. Window does not seal when shut.