Industrial Guttering KZN

Yellowwood Park
Roofing
Fill out the form in 1 minute! Step 1/2

Recent requests

New roof installation or replacement

  • City or suburb: Hilton
  • Property type: Residential home
  • Approx. size of the roof (sqm): 0–100 sqm
  • Is your roof sloped or flat?: Sloped
  • Desired roofing material: Metal sheeting
  • Estimated project start: 1–3 months

Could you please quote me on the attached plans for a house at 36 Hillary rd in Mountain Homes. I would like to know which would you recommend, a Chromadek or tiled roof. Could you give me a costing for both, and if you would include the cost of putting either up. An itemized quote would be useful (Tiles / Chromadek & with or without installation) , and the turnaround time for installation would help me plan accordingly. many thanks

New roof installation or replacement

  • City or suburb: Uvongo
  • Property type: Residential home
  • Approx. size of the roof (sqm): 100–200 sqm
  • Is your roof sloped or flat?: Both
  • Desired roofing material: Metal sheeting
  • Estimated project start: Within a month

I have 2 projects 1 approx 78m2 replace corrugated with ibr., check seal and repair woodwork and barge boards / facials ,almost flat roof..this is a stand alone out building . 1 approx 30 m2 shingles replace with suitable solution. Low slope 10 deg.this is an add on flat to the main house which currently leaks. I need advice on shingles or sheets for the flat. Thanks a mill

Roof repair/maintenance

  • City or suburb: Umtata
  • Property type: Commercial or industrial building
  • Estimated project start: Within a month

We are removing the old scatting and putting a new one (waterproof) in two parking decks and 55 pillars. The scatting is.. 1 ,4 metres long 3,5 metres wide in the parking decks Pillars 1 metres long 3,5 metres wide Old expansion joints to be removed with new watertight sealant. They must be re- tarred and waterproofed over the new sealant X6 x 7 metres X1 x 23,3 metres Grids X4 x 1,4 metres long and metres wide Drains (replacement of old drain covers with steel drain covers)... X47 Reinstate full bore drains (blanked with concrete and install new drainage pipe and new full- bore drain X7 Waterproof of skylight and replacement 6 cracked glasses X6 glasses x 1,8 metres x 1 metre Waterproof the whole pump house, walls and floors 11,2 metres x 2 metres

Roof repair/maintenance

  • City or suburb: Claremont, Cape Town
  • Property type: Residential home
  • Estimated project start: 1–3 months

The existing IBR flat roof is leaking. It is an extension to an old Claremont house and the flat roof covers the kitchen area. It has a ceiling which will need some touch up and repainting. I am wanting to replace the roof with either Galvinised IBR 0.5mm or Chromadek IBR 0.5mm. I estimate we will need 13 IBR sheet (about 9 m wide) of 4,5m lengths.

New roof installation or replacement

  • City or suburb: Cape Town
  • Property type: Housing complex
  • Approx. size of the roof (sqm): More than 200 sqm
  • Is your roof sloped or flat?: Flat
  • Desired roofing material: Metal sheeting
  • Estimated project start: 1–3 months

Hi I hope you are well. We build container homes. I am looking for suppliers for our business that can supply. Delivery Option 1 16 x 9m Flat Roof 7 Gumpoles Flushing all round Colourbond IBR Option 2 9 x 9m Flat Roof 5 Gumpoles Flushing All round Colourbond IBR I look forward to hear back from you. Kind regards, Roelof

Roof repair/maintenance

  • City or suburb: Polokwane
  • Property type: Residential home
  • Estimated project start: Within a month

Good day. We are planning to move into a house, but the thatched roof is leaking. I can see the black underlayer, as it is sticking out. It seems as if there is no underlayer, or if the wiring got loose. The area, according to me, which need to be fixed is about 2x2 meters. Kindly send me a quote on a worst case scenario. Thank you! Regards

Roof repair/maintenance

  • City or suburb: East London
  • Property type: Residential home
  • Estimated project start: Within a month

I have the black slated tiles on my roof and with time and winds they have been moving slightly everytime the rains and winds come and go. I need a contractor to look at and give me a quotation at their earliest convenience. Rgds This would be expected to start immediately. My address is:13 Willasdale Place, Bonnie Doone, East London.

New roof installation or replacement

  • City or suburb: Robertsons
  • Property type: Commercial or industrial building
  • Approx. size of the roof (sqm): More than 200 sqm
  • Is your roof sloped or flat?: Sloped
  • Desired roofing material: Metal sheeting
  • Estimated project start: 1–3 months

Remove and safely dispose asbestos roof sheets (gutters and down pipes included where necessary) m2 25 Supply and install 0.53 Colourplus AZ Prolok sheets m2 25 Supply Install Alububble or similar approved where necessary m2 25 AIA fees (monitoring and clearance sessions - average)

New roof installation or replacement

  • City or suburb: Franschhoek
  • Property type: Residential home
  • Approx. size of the roof (sqm): 0–100 sqm
  • Is your roof sloped or flat?: Flat
  • Desired roofing material: I need advice
  • Estimated project start: 1–3 months

2 x New Flat Board veranda roofs with combined area of ca. 80m2. PLEASE EMAIL FOR PLANS & FURTHER DETAILS ROUGH SPECS : - Rafters x50, - White Isoboard ceiling to verandas, flat ceiling to kitchen area and new shower , - Purlins 76x50, - Basic thermal insulation can be included, - Appropriate flat roof rated, water-resistant Structaboard or similar, - Quality polymer bitumen waterproofing membrane torch-on - including up onto parapet, - Effective formation of water run-off and gutter channels - Finish with appropriate waterproof roof paint

Roof repair/maintenance

  • City or suburb: Noordhoek, Cape Town
  • Property type: Residential home
  • Estimated project start: Within a month

Roof was waterproofed - rubberized - one coat of protective silver paint applied - one sheet got cracked...not sure what happened - worker walked on wrong spot or dropped something ? - big crack in the one sheet dont want to call on previous suppliers as their quote was wrong, their estimate was wrong - they asked for more money after quoting etc