Plans were submitted and approved. An engineer has been appointed. Want to remodel (break down 2 walls and refurbish existing bathroom) sub economic house and add an upper level consisting of a bathroom, 2 bedrooms and a pyjama lounge. The plan is to use nutec/timber on the upper level and a conservatory on the ground floor level. Please see attached plan.
I own the plot between the Clay Oven and Whispering Palms, 36 Hely Hutchison. The plot is empty apart from 2 outbuildings where a security officer lives. I require a service to keep the property from running wild, entailing a cut of the vegetation and general tidy up about once every three months. Quotations invited please .
I have an old wooden floor in a room upstairs, for some years it was carpeted and we left it alone because no one was living upstairs. My daughter has now moved into the upstairs room and we need to get the wooden flooring fixed or replaced as it is making quite a noise. The dimensions of the room is roundabout 8x6.
I wanted to request the advice and a quotation. We have damp coming through the concrete floor, and have been advised that the main problem is that the paving around the house is directing rain water towards the house rather than away from it. We would therefore need to reset the paving and possibly consider other aspects of drainage For your urgent consideration.
We have plans for a multi phase product with various building works needed. Phase 1 - Conversion of double garage into a small flatlet (marked gymnasium on the drawing attached) the drawing only indicates requirements to pass the plans, but we would need all the additionals such as kitchen cupboards, BIC in bedroom and plumbing done (we have our own electrician) Phase 2 - Conversion of outbuilding into small bachelor pad (marked storeroom conversion on the drawings). here it would be the same as per the Garage conversion with less tilework but all the Sanware and plumbing included. The plans for this section will likely change a bit, but the general idea is indicated on the drawings. Phase 3 - Newly Built staff quarters. This will be a complete build from foundation to roofing. Due to the slant of the property the unit will likely be build on a platform or dug out to level the ground for building works. Phase 4 - Yard work. there is a tar driveway that needs to be extended into the property with parking bays. there is also 2 precast concrete walls to put up (10m and 18m approximately) as well as an existing parking bay needing renovation. Please could you be so kind as to provide estimates and quotes divided into the phases of the project so we can make decisions on the order of the phases based on cashflow and budgets.
Repair - maintenance. Roof room was built 30 years ago by Adrian Greylling and is generally in very good condition . We have been very happy with room. However the outer layer of the sheets of wooden material used for the walls, is crumbling in small sections - facing into the weather Would like to assess repair before Cape winter
Additional 3 bedroom on the double garage side. Double garage is 6× 6.5m extend for bedroom of 3.6×3.6 & bathroom with wardrobe of 4.5×2.2. On the floor will be a main en-suite plus open kitchen living room area plus a guest toilet 2×3m. Then upstairs will be a 2 bedroom each 4×5m Sharing a full bathroom of 3×3.5 and extra toilet of 2×3 & the extra 2×3m space will be for entrance upstairs.
Please can you provide quote for Wooden Laminated Flooring. Underfloor is provided already. The flooring is clip on and does not need glue. Also provide quote for 1 level of screed to cover heated under floor. Include material/cement. Use the attached strength. 54 sqm area needs flooring. 19 running meters for skating.
I need a modern, classy house. I could stay in something that wouldn't feel over 5-10 years outdated and out. Lots of renewable energy like solar power. Lots of natural light. Must have 3-4 bedrooms 3-4 bathrooms Open plan kitchen and dining for 10-12 guests Open patio to braai and entertain guests
Looking to build a two-bedroom, two-bathroom house in an estate. Looking at 25sqm per bedroom, inclusive of a bathroom on each bedroom, and 75sqm for the living area, consisting of lounge, kitchen, dining room. Total house size to be sqm. Hoping to have a design that allows for us to build an extra two bedrooms in the future. You can have a look at Romansbaai Beach & Fynbos Estate online for an idea of the style of house.