Ø PVC Soil and Vent Pipe 6m, Ø 50 PVC Soil and Vent Pipe 6m, x 55 x 95° PVC CE Anti-Syphon Horn Bend, x 50 PVC Eccentric Reducer, x 50 x 95° PVC PL Junction, x 95° PVC CE Junction, Ø PVC Holderbat, 50 x 95° PVC PL Junction, 50 x 95° PVC CE Junction, 50 x 95° PVC PL Bend, 50 x 95° PVC CE Bend, 50 x ° Bend, Ø 50 PVC Holderbat and PVC lubricant Soft
- Location: [ office building, residential complex, schools.] - Area to be painted: - Walls (interior and/or exterior) - Ceilings - Trim (baseboards, moldings, door frames) - Doors - Windows - Stairwells (if applicable) - Surface types: - Drywall - Wood - Metal - Plaster - Number of coats: - Primer (if necessary) - 2-3 coats of paint (depending on color change and surface condition) - Color scheme: - Main color(s) - Accent color(s) - Trim color(s) *Services Included:* - Preparation: - Cleaning surfaces (power washing, scrubbing, etc.) - Filling holes and cracks with spackling compound - Sanding rough areas to smooth finish - Removing old paint, wallpaper, and border (if necessary) - Taping off trim, baseboards, and moldings - Painting: - Applying primer (if necessary) with roller or brush - Applying paint with high-quality brushes, rollers, and sprayers - Cutting in around edges, trim, and moldings with brush - Rolling ceilings and large areas with extension pole - Finishing: - Touching up mistakes and spills - Cleaning up drips and runs - Removing tape and protective gear - Disposing of waste materials *Materials:* - High-quality paint ( specify brand and type: latex, oil-based, etc.) - Primer (if necessary) - Brushes (various sizes and types) - Rollers and extension poles - Sprayers (if necessary) - Drop cloths and protective gear (tarps, plastic sheets, etc.) - Sandpaper and sanding blocks - Spackling compound and joint compound - Tape and masking materials *Timeline:* - Start date: we start on the day of commences - Completion date: we comply with the date of completion - Working hours: 8am-4pm, Monday-Friday] *Additional Requirements:* - Working around furniture and fixtures (if not removed) - Protecting floors and surfaces with drop cloths and plastic sheets - Ensuring adequate ventilation and lighting - Complying with safety regulations and standards
When switching the geyser on it trap mainshwitch ( electricity)
I would like to have the faucets in my bathroom replaced. Currently they are two separate faucets. I am flexible to keeping them separate or combining them into one. I do not have the parts myself and would like to be advised whether the faucets can be prov8ded or if I should get them myself for installation.
Hello. I want palisade fencing installed infront of my property. It's 1,5m on one side and 16m on the other side. I do have a tree in front of the property and would like that section to have the fence bent around the tree. I am situated on the bluff. Please contact me when you have a chance. Thank you.
We are staying now for two years at the place. In these two years the wall on the other side of shower and Linen cupboard are constantly wet. Either the tiles were laid down without waterproofing. We just suspect a quick fix was done before we moved in. We would want to find out where the leakage is. And how much to fix or to put in a bath in the place of the shower.
All porcelain has been eaten away inside toile bowl where tenant poured and left pool acid in , the outlet to the toilet also has acid residue and damage. The push in pop out drain plug to the basin has been eaten away completely. The pipes underneath the basin leaks from I suppose the volumes of acid poured down it. I would need the toilet taken out and replaced, the waste pipe taken out and replace as well as the basin waste pipes, plug and waste trap
I would like to extend the height of my fence on the one side of my property, however, the wall isnt all one level and has 4 different levels. i would like a wooden topper to connect to the existing wall about a third of the way from the top of the wall, to provide extra privacy. 3 of the walls are 4.5m in length and one wall is 4m in length which totals at 17.5m, but the panels would need to be custom made.
1. Option 1 is the Blocks walling for perimeter fencing at 3km with a height of 2.1m n width of 14omm with shark spiketeeth on top. 2. Option 2 concrete wall panels (6m lengths at 3m height n mm width) for 3km with shark spiketeeth on top. 3. Option 3 clear view fence 3km n 2.1m height with shark spiketeeth on top.
Same color to be used as on walls biscuit color. Around doors and windows 10cm sq. boarder with same color which is charcoal. Only front section of the roof require painting. The use of durable exterior paint must be used. The white nova board under the over hanging roof beneath must also be repainted and where required if the wood has deteriorated be replaced.