Full bathroom renovation for two bathrooms.Bathroom remodel. Remove all old file (wall and floor) and fitting (tub, toilet, basin). Replace with new fittings (walk-in shower, toilet, basin). Remove old floor and wall tiles, toilet, tub, hand basin. Replace with new tiles, walk-in shower, taps, basins etc Bathroom 1 - 22.5m2 , Floor 5m2. Bathroom 2 - 27.5m2 , Floor 7.5m2.
People came and ripped my copper pipes off the wall. I've replaced most of them except my kitchen tap pipes. I'm wanting to change them to polycorp pipes connected to the previous copper pipes that I've replaced. You need 5 corner pipes with piping and a T pipe and 1 galvanized/copper pipe that needs to go through the wall.
External & internal taps removed
Water leak in one of the pipes
Install water tank with pump and connection to the house Install geyser