Refurbish 3 off canti lever type car ports be replacing the cross-over structure, refurbish remaining structure and cover with new water proof shade net Size ± 23mx5.5m Shade net colour to be close to Eskom's coperate colours and water proof Al meterials used to be UV stablised and suitable for outdoor use. Remove old shade net Dismantle complete structure Replace cross over structure with new similar structure Sand down/shotblast the remaining structure to remove all existing paint and signs of rust Check structure integrity and repair where necessary New steel tention cables to be of anti corion type Replace all fastners (bolts, nuts, washers and screws) with new anti corotion fastners Paint complete structure with a undercoat with rust inhibeter Paint top coat according to Eskom corperate colour sceme Install new water proof shade net All scrap materials to be discarded using the Lethabo waste steam.
This is what I want done Windows inside and out and blind cleaning Carpet cleaning 3 bedrooms and lounge. Just around the beds no moving of furniture not a lot of carpets A thorough clean of the house 2 bathrooms and laminated floors Oven Stove to be cleaned Patio to be cleaned Net curtains lounge two windows and dining room to be washed
Good day, We are the managing Agent group for a property in Wellington, SA. There are Three Units on this yard. Two of the Units have reported maintenance issues. Can you please assist with quotes on the following issues. Quotes needed from 3 x Contractors/Handyman's please. - Unit 1 - separate Quotes for each issue in this Unit. Quote 1.1: Bedroom Light - Light will not turn on. Bedroom Floor/Tiles - Cracked floorboard as well as several soft spots in the floor. Quote 2.1: Bathroom Tap - Once tap is opened it will not shut off. Quote 3.1: Outside Drains - Drain not working. Will not drain as it is higher than the gutter. Filter is not in and cannot be put in. Quote 4.1: Outside Roof - The fascia is rotten under the gutters. Gutters is also broken. - Unit 2 - separate Quotes for each issue in this Unit Quote 1.2 BATRHROOM: Storage cupboard - Door came off and hinges damaged Bathroom door handle - Broken Quote 2.2 ELECTRICITY: The electricity trips each time I put the geyser on - but only if the kettle or microwave was in use. If the kettle or microwave/airfryer is not in use, the electricity does not trip when the geyser is put on.
**1. Face Brick Double Wall with Pillars (2.4m x 15 mete): ** **2. Face Brick Single Wall (1.8m height x 10): ** - Face bricks (matching existing): - Cement: - Sand: - Labor for construction: **3. Foundation Replacement: ** (15m) - Excavation and removal of existing foundation: - Concrete mix for new foundations: - Reinforcement bars for foundations: - Labor for excavation and foundation replacement:
Good day, I am in the process of considering to buy and renovate a house. There is a few notable changes I would like to consider. The first one is to extend the current garage in order to accommodate a second vehicle. The garage currently is 16,5m squared and the backyard can accommodate the extension. A door will need to be added for courtyard and braai room access. The second change is to revamp the current front wall to accommodate a motorized gate. Not too sure if this will need to get approved or designed by an architect? Third change is to close off an existing sunroom for privacy. The wall will be approximately 4,21m and will need a few windows for sunlight. Fourth change will be to extend the current living area to create a braai room. This will join the tandem garage and will be dependent on the building lines allowed by the building commission / municipality. If all goes well, this change will be approximately 24,6m squared (8,2m x 3m) The fifth and final potential change is to add a scullery. This will be a smaller extension and accounting for 3,75m squared (1,5 x 2,5m) Please see attached original house plan and potential changes included. Kind regards,
Remove all existing bathroom floor and wall tiles. Install new shower and tile entire floor with only the wall in shower area to be tiled, remaining bathroom to be skimmed and painted white. bathroom is approximately 7 sqm (en suite). One entire wall (2m x 2.5m) has existing pine cupboards, floor to ceiling. Existing toilet and bidet to remain in place.
Moved in to this house end November I saw the bedbugs on a curtain and cleaned the room I have fumigated twice but they still pop up in the one bedroom and the outside room They are in the beds as well I have been using blue death en efekto Fumo tabs but it’s still a struggle The house is between two open fields I don’t see the bugs outside but one will never know
I have an existing 12m High Cube container on my property in Betty's Bay. It is intalled on 0.50m plynths and has existing plumbing and electricity. Extend the width by 0.80m along the full 12m length using timber framing Instulate the unit and finish interior with dry wall. Fit 3 x windows (supplied) along timber extention. Fit 1 x sliding door (supplied) at opening end of container Close existing single door opening with container wall removed for extension Roof unit with 0.35m overhang all around
25m2 Shutterply floor to be covered by roof and ceiling and then allround glass stacking doors to follow. Once completed, let's cover the shutterply with a beautiful cost effective vinyl. Looking to purchase the vinyl and install myself, alternatively could be installed by supplier if the price is right.
Arrival - Tea and Coffee with Scones and assorted Fruits Lunch (85 People) - Starches (Rice and Dumpling) - Protein (Grilled Chicken and Beef Stew) - Sides (1 x vegetable and 1 x salad) Drinks: - ml Bottled water still X - ml canned soft drink X 70 - ml Bottled Fruit Juice X 30 Halaal Catering (15 people) - Starches (Rice and Roti) - Protein (Lamb curry and Grilled Chicken) - Sides (tomato and carrot salsa)