Hi-Tech Roofing Stanger

KwaZulu-Natal
Roofing
Fill out the form in 1 minute! Step 1/2

Similar pros near KwaZulu-Natal

Leaky Roof, Pinetown

 
0 reviews

Recent requests

Roof repair/maintenance

  • City or suburb: Plumstead
  • Property type: Residential home
  • Estimated project start: Within a month

Replacing corrugated iron sheeting over: 34 sq m L-shaped area over single-garage and adjacent room. Single pitch. Including 7.5m flashing over timber barge board. 14.5m flashing to brick parapet. 42 sq m rectangular area over double-garage. Single pitch. Including 21.5m flashing to brick parapet including around 3-sides of chimney. Timber structure in excellent condition

New roof installation or replacement

  • City or suburb: D'Urbanvale
  • Property type: Housing complex
  • Approx. size of the roof (sqm): 0–100 sqm
  • Is your roof sloped or flat?: Sloped
  • Desired roofing material: Metal sheeting
  • Estimated project start: 1–3 months

Area want to cover is approximately 6x6 meters. It is a brick paved stoep area which would be attached to the house on two sides. Would like a quote for either a white or pearl polycarbonate roofing sheets of fairly good quality or a alluminium louvre roof. We have just removed the previous pollycarb roofing sheets as they were cracked and damaged.

Roof repair/maintenance

  • City or suburb: Highveld
  • Property type: Residential home
  • Estimated project start: Within a month

My roof is largely slab and IBR. It is therefore a combination of IBR and concrete slab. One side of the house has what is called Parapet roof. About a year ago I paid a contractor to re-waterproof the the whole roof. They applied the burn-on layer on the concrete slab and they used the membrane and resin on the rest. Unfortunately it is still leaking and I am unable to get them back to repair it. They promise to come but they never do. it has been those promises for quite a long time now. I am now trying to get another service provider to deal with as I am worried that the spring and summer rains are just weeks, if not days away.

New roof installation or replacement

  • City or suburb: West Bank
  • Property type: Residential home
  • Approx. size of the roof (sqm): More than 200 sqm
  • Is your roof sloped or flat?: Flat
  • Desired roofing material: I need advice
  • Estimated project start: 1–3 months

IRB ,type arrangement, old property, roof slope is insufficient, contribute to the internal leakage.I need advice for either replace roof and modify the slope to allow better water drainage. OUDTSHOORN is area with high temperatures, the external repairs were mostly coating with material fiber, as expect will fail with in due time as result off the temperature changes. I want a permanent guarantee for the propose repairs or replacement.

New roof installation or replacement

  • City or suburb: Oudtshoorn
  • Property type: Residential home
  • Approx. size of the roof (sqm): 100–200 sqm
  • Is your roof sloped or flat?: Both
  • Desired roofing material: I need advice
  • Estimated project start: 1–3 months

IRB ,type arrangement, old property, roof slope is insufficient, contribute to the internal leakage.I need advice for either replace roof and modify the slope to allow better water drainage. OUDTSHOORN is area with high temperatures, the external repairs were mostly coating with material fiber, as expect will fail with in due time as result off the temperature changes. I want a permanent guarantee for the propose repairs or replacement.

Roof repair/maintenance

  • City or suburb: Paarl
  • Property type: Residential home
  • Estimated project start: Within a month

Remove plastic roof sheets Replace with sink roof sheets either 3m or 3.6 m in length I will buy the material and that will include the sink sheets as well as: 2 x 5 Ltr Cemiflex, 2 x Rolss of mm x 10m membrane, 1 Bag of Portland cement, I therefore require a quote for labour to do this job Thanks

New roof installation or replacement

  • City or suburb: Vanderbijlpark
  • Property type: Housing complex
  • Approx. size of the roof (sqm): 0–100 sqm
  • Is your roof sloped or flat?: Flat
  • Desired roofing material: I need advice
  • Estimated project start: Within a month

Roof installation to cover patio area with a length of 9 meters and width of 3 meters. Timber structure with a maximum beam span of 5.5 meters. Roof covering, should either be flat polycarbonate sheet or flat acrylic sheet. Roof should preferably be installed below the eaves of the existing roof with a pitch of 7 degrees

New roof installation or replacement

  • City or suburb: Hermanus
  • Property type: Residential home
  • Approx. size of the roof (sqm): 0–100 sqm
  • Is your roof sloped or flat?: Sloped
  • Desired roofing material: Metal sheeting
  • Estimated project start: 1–3 months

The complete roof must be replaced with Diamond ck. A quote for Material and a quote for Installation to complete. All the work. I do have a certified asbestos company that will remove the current asbestos sheeting. Dont quote on that but all the rest Please. Attached the Drawings on old Photo. and some dimensions.Many Thanks. Die mates is Lengte 15.0m Breedte 10.5m Die pitch is 35 grade bo die horisontaal. Ek het die dakhoogtr uitgewerk as 3.6m. Die gedeelte op die nok is 5.4m. I have Drawings how can i share

New roof installation or replacement

  • City or suburb: factreton
  • Property type: Residential home
  • Approx. size of the roof (sqm): 0–100 sqm
  • Is your roof sloped or flat?: Sloped
  • Desired roofing material: I need advice
  • Estimated project start: Within a month

Good day i need some assistance regards to a quotation for my roof . my house is insured by auto/ general The pass winter we had some water leakage from the ceiling and due to the heavy rains it left a hole in the ceiling ,so then we knew that somewhere on the roof there might be a leakage, thats why the water was coming through the ceiling , all our rooms are now moulded , Please can you send someone out to come and give us a quote , regards

Roof repair/maintenance

  • City or suburb: MBOMBELA
  • Property type: Residential home
  • Estimated project start: Within a month

The roof is leaking, upon my inspection i discovered that that the tiles are not even. When is raining heavily that is when the leaking is taking place. I suppose that the roof tiles needs to be fixed and be places in a correct way. the project can take one day to be fixed because is a small portion.