I bought a house that was being renovated, a few things were not done or not done properly e.g. laminate were done but the edge at one of the doors was not done and that has made matter worse.
2x3 meter thatch replacement
The size of the floor plan will be square meters with lot size of squares.
Good day, We require assistance with the repair of a corrugated roof (about 30 x 10m) and a flat roof that is surrounding the building, please see photos as reference. Thanks,
2 toilets are running. I have to turn the water off to stop it running. 1 toilet is dripping at the pipe heading into the loo. The top element in the oven isn't working. Is this something you can look at? One recliner's mechanism is broken. Pull the lever and nothing happens Please send me a WhatsApp message before calling as I don't often answer foreign numbers.
Waterproofing to the balcony: Aluminum doors will be removed to the balcony Aluminum doors and frames will be wrapped in bubble wrap and stored in the garage for safekeeping until re-installation. All cement and waterproofing layers will be chopped up and removed off-site from the balcony. Rubble skip will be on-site and removed once it is filled. All existing waterproofing will be removed. mm Turn-ups will be chopped off in order to apply the waterproofing application onto the bricks. Existing outlets will be removed. New 63mm Flange outlets will be fitted to the parapet walls to allow water to discharge outside of the balcony. Screed-to-fall will be done to ensure water runs out of the outlets, and that there will be no water ponding in any areas. 50x75mm Angle will be fitted where the door will be fitted to prevent water from running back into the rooms. The waterproofing application will consist of the following: x2 Coats of Mapei-Lastic Mapei-tape to all turn-ups and corners and into the cavities. Mapei-net the flat surface x1 coat will be applied, followed by the Mapei-net and Mapei-tape being applied on top of the 1st coat. 2nd coat will be applied over all of the above-mentioned after 24 hours. Aluminum doors and frames will be re-fitted. Turn-ups and bands around the frames will be plastered to a smooth finish. Waterproofing application and plaster will be left for x3 days before the painting and tiling can commence. New tiles will be installed.
I need my awning gutter and my roof gutter quotation which was damaged by municipality contractors. They are needing the quote and pay for it.
Has old tiles on roof. Not waterproofed currently. Some dampness gets through. Need to be fixed or replaced with new tiles. Advise would be appreciated on what would be the best option. We measured the sq m of the floor, about 17m x 10m plus the stoop overhang which is 20 sqm.
I want do have a double garage with 3 bedrooms main bed with the end suit and and a open plan of a kitchen and the living room