I will need a brick wall (no plastering) to be built in the front/entrance to the property. I would like quote for both a 6 foot and an 8 foot to compare please. The length of the front is 28.m. I would also need a solid motorized gate (extending as far down to the ground as possible) also to be put up with the erection of the wall. The start of the project would only be late January, early February next year.
We have a unit that originally had a balcony (1.2m x 4.0m), that the previous owner closed up with hardwood floors. We want to return it into a balcony: remove the windows, return the balcony floor to the original concrete, and install a sliding door again. We already had the wooden floorboards removed, but we need a quote on: - Removal of screed (where the floorboards used to be) - Finishing of the drop / sliding door cill, from the inside of the apartment to the balcony floor (where the sliding door frame will be installed) - Finishing of the balcony floor (smooth concrete, as it was before, is OK) to make sure that any rain will flow to the original draining pipe. - Cleaning of screed/rubble. Please see the attachments. We need measurements and briefing with the sliding door installation company to happen tomorrow (Wed 13 Dec). But we are flexible with the job start time (either this week before Friday or in middle January) For now, we only want a quote on the screed removal / return to concrete flooring / preparation for the sliding door frame. Depending on the quality of the job, we will consider you for the removal of the windows and finishing of the exterior wall (once the sliding door is installed).
i need the bathrooms X 2 renovated, fitted with a new cabinets, toilet set and the ceiling to be fixed and the floors and wall tiling thereof. there is also an outside toilet which needs to be fitted with a new set. The ceiling for the whole house needs to be redone, 2 bedrooms, living room , dining room and the kitchen. The 3 bedrooms to be tilled. thanks
We would like to have our garden weeded, cleaned and the soil turned on the perimeter of our home, please. There are leaves and debris from quite a few trees that were trimmed today (Friday) We would like the mound/garden refuse compost heap at the rear of our property to either be used or disposed. There may be additional items to be done
This is a very old property and it’s one of those old Hutton properties where everything needs to get sorted out from the electrical stuff I mean the electrics in the house is just appalling it needs a solar rooftop thing, there’s air locks in in the system so there’s often times where we don’t get water. There’s a lot that needs to be done
The site is a triangle. A small front equals to a car gate area. I have a plan draft which depicts a small double storey house with a basement. My plan has one large en suite bedroom, small kitchen a lounge, 2 bathrooms and a dressing room on the upper floor. An entrance hall and staircase on the ground floor. A basement underground. The roof is concrete and has skylights which are protected by burglar guards. The whole house will built of concrete like a bridge. Three small windows only; 2 x for bathrooms and 2 at a passage. Skylights and a number if top and bottom ventilators. Security against looting and buglar is emphasised on plan. Dust also is considered. Only one door. Top door leading to the roof.
Plot size: sqm. Log house, pine ceilings, 3 bedrooms, 2 bathrooms, lounge, modern kitchen with modern furnishes, tv room, entertainment area with indoor fireplace, tiled floors, build in cupboards in bedrooms (walkin cupboard in main bedroom) , kitchen, laundry room, 2 x garages with rollup doors and carport, tiled paving, storage outbuilding, modern tinted windows, strong wooden doors.
I would like to build a 5 bedroom modern steel framed house in a village on a tribal land. I have already bought the land (60m x 30m). I estimate the house to take up approximately sqm as it has to be a double storey. I have attached a pictures to provide an idea of the kind of a home I am looking to build.
We currently have a 2 bedroom house which we would like to demolish , since it has a lot of cracks and the structure is not strong anymore . The plan is to build a house with 4 bedrooms* [bedroom 1 ] main bedroom [bedroom 2 ]Twin Room 3/4 twin beds fit [ bedroom 3 ] double bed size cm [ bedroom 4 ] double bed size cm 1 bathroom + toilet Open plan kitchen and sitting room and inclu a double garage .
Inside the yard Left side - lawn maintenance and planting of flowers at the edge of the lawn next to the wall. Removal of rubbish dump Right side - uneven ground that requires flattening of the ground, planting of half of the lawn which is infiltrated by weeds. Outside the yard Left side - maintenance of lawn and flowers Right side - 2m X 70m requires new lawn and wall floors