install 9 double plug points chasing has been done, we will supply plugs, install 4 light switch points, most wiring is done new outdoor double plug we will supply 3 ceiling fans with remote control in existing lights 2 new single plugs in kitchen for extractor fan and ignition on gas oven, chasing done, we will supply plugs new junction box in bedroom ceiling some extras this job is very urgent as we were let down
QUATION OF 48SQM STUDIO ROOM KITCHEN BATHROOM OPEN PLAN CEILING AND DRYWALL ON TOP OF POLES 2.4M.HEIGHT FOR CAR PARK UNDERNEATH 5ALUMINUM WINDOWS X IBR ROOFING 2 to 4 ALUMINUM SLIDING DOORS PLUMBING AND ELECTRIC IS INCLUDED BACIN ,TOILET, SHOWER, ALL FIXED AND SUPPLIED PLUGS AND LIGHTS, WIRING DB BOX,SWITCHES FIXED AND SUPPLIED Something similar to the picture attached, but preferably not wood, steel, concrete, prefab anything else
We need advice on what needs to be done to obtain a COC. It is a farm / rural/ setting. We then need a COC to be issued when compliant as well, We were also advised to rather remove unnecessary items like pumps for water fountains, "pretty stoep lights" and self installed leads etc. The are three Eskom low amp boxes on the property that feeds each building
Require a quote for a repair for a water meter with a leak on the incoming pipe from the main in the street, to entering the meter. The meter is old apparently and the brass or copper pipe seems to be rusty and is clearly leaking at the joint. It possibly has more leaks. I need a detailed coating of the repair in terms of materials needed and hours to repair. My voice is recovering at the moment, so I won’t be audible on the phone. Please whatsapp/email me.
Waterproofing to the balcony: Aluminum doors will be removed to the balcony Aluminum doors and frames will be wrapped in bubble wrap and stored in the garage for safekeeping until re-installation. All cement and waterproofing layers will be chopped up and removed off-site from the balcony. Rubble skip will be on-site and removed once it is filled. All existing waterproofing will be removed. mm Turn-ups will be chopped off in order to apply the waterproofing application onto the bricks. Existing outlets will be removed. New 63mm Flange outlets will be fitted to the parapet walls to allow water to discharge outside of the balcony. Screed-to-fall will be done to ensure water runs out of the outlets, and that there will be no water ponding in any areas. 50x75mm Angle will be fitted where the door will be fitted to prevent water from running back into the rooms. The waterproofing application will consist of the following: x2 Coats of Mapei-Lastic Mapei-tape to all turn-ups and corners and into the cavities. Mapei-net the flat surface x1 coat will be applied, followed by the Mapei-net and Mapei-tape being applied on top of the 1st coat. 2nd coat will be applied over all of the above-mentioned after 24 hours. Aluminum doors and frames will be re-fitted. Turn-ups and bands around the frames will be plastered to a smooth finish. Waterproofing application and plaster will be left for x3 days before the painting and tiling can commence. New tiles will be installed.
we have been renovating some of the house over the last couple of years, but we are looking to upgrade so that we can sell the house for more. upgrading includes a full renovation of the kitchen and scullery area, upgrading two bathrooms, replacing all the window frames and flooring, skirtings, fireplace, painting and stiling the 5 bedroom house.
Waterproofing to the balcony: Aluminum doors will be removed to the balcony. Aluminum doors and frames will be wrapped in bubble wrap and stored in the garage for safekeeping until re-installation. All cement and waterproofing layers will be chopped up and removed off-site from the balcony. Rubble skip will be on-site and removed once it is filled. All existing waterproofing will be removed. mm Turn-ups will be chopped off in order to apply the waterproofing application onto the bricks. Existing outlets will be removed. New 63mm Flange outlets will be fitted to the parapet walls to allow water to discharge outside of the balcony. Screed-to-fall will be done to ensure water runs out of the outlets, and that there will be no water ponding in any areas. 50x75mm Angle will be fitted where the door will be fitted to prevent water from running back into the rooms. The waterproofing application will consist of the following: x2 Coats of Mapei-Lastic Mapei-tape to all turn-ups and corners and into the cavities. Mapei-net the flat surface x1 coat will be applied, followed by the Mapei-net and Mapei-tape being applied on top of the 1st coat. 2nd coat will be applied over all of the above-mentioned after 24 hours. Aluminum doors and frames will be re-fitted. Turn-ups and bands around the frames will be plastered to a smooth finish. Waterproofing application and plaster will be left for x3 days before the painting and tiling can commence. New tiles will be installed.
Good day Sir / Madam I trust this email finds you well. We are kindly requesting you guys come and do a site inspection at 90 Bekker Road, Vorna Valley Building A, Hertford Office Park, Midrand ( Do advise when you can come through) on the following request, • 5 Red plugs with 5 external multiplugs • The plugs must be round on the LIVE POINT ( not a half hole please ) • The plugs will be mounted on the poles and external multiplugs can be connected externally there ( picture attached ) The quote must include the following: • Labour rates ( For after-hours) • Show us a consumable explanation of the reg plugs in terms of power usage • installation costs (Including Cabling on walls and desk to the Genset)
Please I would like to have a quotation of a building that has a floor and ceiling that is damaged because of an air handling unit that is placed on top of timber floor. The ceiling below that floor is also affected. Please I would like to have the following in the quotation: 1. An investigation on the cause and extend of the water damage on the floor/ceiling. 2. On top of the timber floor there is a torch-on waterproof. What is the rate of the waterproof when it is removed and when it is replaced with new. Thank you. Kind regards,
plumbing a bathroom needs to be done over as it is an old steel bath where plumbing is not in wall but on the wall. tiles also need to be replaced. it will be a bath with a shower overhead, basin also be replaced. garage roof also needs to be done over the wooden strip on wall against which sheeting is mounted is rotting badly so whole roof needs to be done with most of the frame still being in excellent condition. poor waterproofing caused the rot. one face board on the main home also needs to be replaced. possibly would like the wall in front of home removed and replaced with solid sliding steel gate as well. this gate will be manual not motor based