I will like to know, I have a 2-bedroom property in Midrand and I currently am using about R a day on electricity tokens, which I was told is a lot, below is the items that is in the house. My meter box is a Hexinga. I bought the house and that’s the box that was there. I have a gas stove so no power from there is being used, the geyser is on, the TV’s are on but not through out the day and lights, fridge is on, but that’s about it and we 3 in the property and still the usage is high. Is it possible to do a check and what will be the charge
I have 2 wall sharing outbuildings. I would like 1 of the unit to have plumbing and electric completed. The plumbing pipes are already in place, just need connection in bathroom. Electricity needs to be pulled from main house to outbuildings. Then interior will need cementing in bathroom and main room(bachelor unit no walls besides bathroom). Roofing is in place, it's corrugated. Will need ceiling.
We require someone to do electrical cable runs under the ground around a property (property size Dual Ducting along route for our fibre line. We will need 3 outdoor plug points in a outdoor enclosure (enclosures to be provided by you) V at all 3 points, including the guards room. We are also looking for someone to lay Fibre with 18 Fibre splicing at each camera post.
Fault-finding, Repairs and installations: 1. 2 inside lights (fault finding and repair) 2. Installation of a 60A circuit breaker on the main DB 3. Installation of an 8 way sub DB 4. Running a m surfix cable disconnecting the existing cable from the current nodal point (Underground including wire ways -pvc conduit) 5. Replacing 1 single pole - 2 lever switch. 6. Rewiring of 1 single pole switch - 2 lever switch. 7 . 2 outside floods lights (fault finding and repair) 8. Installation (light circuit and socket outlet) at the guard house. 9. Installing 10 photo cells on the existing circuitry
Fault-finding, Repairs and installations: 1. 2 inside lights (fault finding and repair) 2. Installation of a 60A circuit breaker on the main DB 3. Installation of an 8 way sub DB 4. Running a m surfix cable disconnecting the existing cable from the current nodal point (Underground including wire ways -pvc conduit) 5. Replacing 1 single pole - 2 lever switch. 6. Rewiring of 1 single pole switch - 2 lever switch. 7 . 2 outside floods lights (fault finding and repair) 8. Installation (light circuit and socket outlet) at the guard house. 9. Installing 10 photo cells on the existing circuitry
Repainting a 3 bedroom, 70 square meters house,with double garage, insides, outside, roof. Repaint yard walls and gates. Fixed / realign kitchen drawer rollers. Fix few damaged plaster areas. Install a small the toilet basin cupboard. Install / run electric cable from house to gate Install 4 front wall lights. Fix kitchen sink cupboard
We had our house renovated and the guys assigned to do our electrical work completed in August, they tried to install a light but opened the DB to draw a wire and problems started..Our earth leakage trips randomly..they tried to fix it but failed, now they had to bypass the earth leakage and even changed the prepaid meter so that we can temporarily have electricity. The previous prepaid meter was showing an overload even when eskom was off. The new meter constantly beeps and signs bypass. We have seen 2 electricians thus far.
Installing electricity from scratch in a 4 roomed house with a toilet/bathroom/shower (fifth room). 1. Removal of DB from outside of the house 2. The DB will be in a garage. 3. The lounge will have 2 plug points (double) and 1 double switch. 4. The kitchen will have 3 plug points (double) and 1 double switch. 5. The main bedroom will have 2 plug points (double) and 1 single switch. 6. The second bedroom will have 1 plug (double) point and 1 single switch.
Good day, I am looking for a quote to fit an outside waterproof plug to my new JoJo tank. The tank is standing outside and is close to a bedroom where we could get access to a wall socket for a connection to the water pump. Length is approx 15 meters of cable.... the tank will stand in the corner as in the photo... there is a bedroom behind the brick wall where we can access a wall socket
1.) Remove existing section of Aluminium Extruded gutter. (~3m) 2.) Remove existing rotten barge board/facia board (~ 40mm x mm x 3m) 3.) Replace (2 above) with new piece of barge board/facia board (~40mm x mm x 3m) 4.) Treat with Creosote 5.) Replace Aluminium Extruded gutter (~3m, removed in 1) with proper slope. End of job scope