Inside the yard Left side - lawn maintenance and planting of flowers at the edge of the lawn next to the wall. Removal of rubbish dump Right side - uneven ground that requires flattening of the ground, planting of half of the lawn which is infiltrated by weeds. Outside the yard Left side - maintenance of lawn and flowers Right side - 2m X 70m requires new lawn and wall floors
The intention is to build a high -end market self catering chalets, roughly 8 three bedroomed with one building(9th structure)serving as the admin quarters. Currently the plot is vacant but a construction company has already been appointed while some administrative necessities are being complied with at Municipal level. The idea is to create a beautiful environment which provides each chalet with necessary privacy and the whole establishment with charming ambience.
Trimming of shrubs , too much shade has caused lawn to die. Also always too many leaves to remove . Suggestions needed to enhance the space. Please contact me via Whatsapp. I live in Hermanus, my garden is small and has become too shady for the grass to grow , so a solution for this is what I’m looking for .
Existing quadrant shower rail does not attach properly to the side brackets on the wall. The rail lifts and had in the past caused one of the sh9wer doors to fall and shatter. I installed a new shower door however the problem with the top rail persists. I wouod wondering is someone could assist to remove the old fault shower f.rame and install a new decent one for me
1.) Remove existing section of Aluminium Extruded gutter. (~3m) 2.) Remove existing rotten barge board/facia board (~ 40mm x mm x 3m) 3.) Replace (2 above) with new piece of barge board/facia board (~40mm x mm x 3m) 4.) Treat with Creosote 5.) Replace Aluminium Extruded gutter (~3m, removed in 1) with proper slope. End of job scope
We have a unique water saving product which needs to interface with the hot water pipe going to the mixer of a shower. The products consists of two boxes, one housing a flow switch and a solenoid valve. Work to be done: If the hot water pipe is accessible from the top in the roof then the two pipe attachments of the flow control need to be interfaced with the pipe. If the hot water pipe is not accessible then the tiles need to be removed from the shower wall to get access to the hot water pipe and a small box housing the flow control equipment needs to be fitted to the shower wall. The cable which is used to measure flow and control the solenoid valve needs to be placed between the tiles and fitted to the electronic control which is linked to the AC supply.
Recently my EL on the main DB has been tripping. There is a grid typed inverter(installed 6-8 years ago) with neutral and earth internally bonded before this EL, that has it's own DB board with it's own EL downstream of the inverter. Problem varies in frequency but becoming more frequent. Main DB and EL runs the house. Stove. Geyser. Rooms etc.
Good day, We are the managing Agent group for a property in Wellington, SA. There are Three Units on this yard. Two of the Units have reported maintenance issues. Can you please assist with quotes on the following issues. Quotes needed from 3 x Contractors/Handyman's please. - Unit 1 - separate Quotes for each issue in this Unit. Quote 1.1: Bedroom Light - Light will not turn on. Bedroom Floor/Tiles - Cracked floorboard as well as several soft spots in the floor. Quote 2.1: Bathroom Tap - Once tap is opened it will not shut off. Quote 3.1: Outside Drains - Drain not working. Will not drain as it is higher than the gutter. Filter is not in and cannot be put in. Quote 4.1: Outside Roof - The fascia is rotten under the gutters. Gutters is also broken. - Unit 2 - separate Quotes for each issue in this Unit Quote 1.2 BATRHROOM: Storage cupboard - Door came off and hinges damaged Bathroom door handle - Broken Quote 2.2 ELECTRICITY: The electricity trips each time I put the geyser on - but only if the kettle or microwave was in use. If the kettle or microwave/airfryer is not in use, the electricity does not trip when the geyser is put on.
Recently had a Mercer inverter installed. Can't understand why green light stops and goes on all the time. This is the 2nd set of batteries he got for me. He doesn't get back to me. I am on pension and have been badly let down and taken advantage of. I cannot afford to pay a large sum of money for a call out. I just need advice please. Deeply disappointed and depressed about the matter. This is not what i bargained for. Thank you.
An electrical installation is a group of items of electrical equipment that are permanently electrically connected together and can be supplied with electricity from the works of an electricity entity or from a generating source. An item of electrical equipment may be part of more than 1 electrical installation. Steps to Install electrical distribution board You must have to install the feeder pipe at first. If you're using metal pipe, place a plastic bushing over the connector threads. Using a tape, pull the electrical feeder wires through the feeder pipe. Leave enough wire to get to the opposite side of the panel.