Boundary wall consisting of brick wall mm high and pillars of 1.8m high and mm wide spaced 2.m. Between pillars on top of mm a palisade type barrier (potential for metal lattice work or Nutec). Easten boundary 27m long, Northern boundary 34.m which include a sliding gate of 4.m, angled street resave boundary of 7,07m and western boundary of 22m The pillars is mmxmm on a mmxmmxmm base. Wall section is on a mmxmm strip foundation
It is a new site in a semi-rural area. This is a family house which we want to make a home away from my granny's home. Two garaged house with an ensuite in the main bedroom and another separate bathroom for guests, it must be an open plan lounge, dining room n a kitchen. The estimated project time frame is 2months. You can give me a call to discuss this in more detail. Thank you
I want to build a 3 bedroom house with the main bedroom on one end of the house and the other two on the other end. In between the bedrooms may be the kitchen lounge and dining room, all open plan. Each bedroom must have a built-in wardrobe. How much do you charge per square meter? 2. I need a draftsman to draw the plans for me I am situated in a rural area. Thank you
We have just purchased an old house that requires some TLC and/or remake to suit our taste, e.g. bigger kitchen with scullery, wooden floors repair & restoration, additional outdoor lighting, borehole water softening & purification, converting outside old bucket toilet into flushing one and finally look at solar system installation options.
I have sample plan to serve as an example. We are planning to rent commercial property that we want to renovate and turn into a radiology medical facility. The property need to be renovated to have a reception area, a waiting area for patients, a kitchen for the staff, a lounge resting area, a room that with small single compartments to allow doctors and other staff to sleep/rest while working overnight/overtime and an office space for the staff We are looking at square metres to spare metre rented facility. I have uploaded 2 sample plans of the other testing radiology rooms. so it won't look exactly like tis plan, but these are samples of how we would like the facility to look like. I would like quotes, or an idea of how the entire renovation cost would cost us. the building material cost, and labour, just a rough estimate would be great thanks
QUATION OF 48SQM STUDIO ROOM KITCHEN BATHROOM OPEN PLAN CEILING AND DRYWALL ON TOP OF POLES 2.4M.HEIGHT FOR CAR PARK UNDERNEATH 5ALUMINUM WINDOWS X IBR ROOFING 2 to 4 ALUMINUM SLIDING DOORS PLUMBING AND ELECTRIC IS INCLUDED BACIN ,TOILET, SHOWER, ALL FIXED AND SUPPLIED PLUGS AND LIGHTS, WIRING DB BOX,SWITCHES FIXED AND SUPPLIED Something similar to the picture attached, but preferably not wood, steel, concrete, prefab anything else
Waterproofing to the balcony: Aluminum doors will be removed to the balcony Aluminum doors and frames will be wrapped in bubble wrap and stored in the garage for safekeeping until re-installation. All cement and waterproofing layers will be chopped up and removed off-site from the balcony. Rubble skip will be on-site and removed once it is filled. All existing waterproofing will be removed. mm Turn-ups will be chopped off in order to apply the waterproofing application onto the bricks. Existing outlets will be removed. New 63mm Flange outlets will be fitted to the parapet walls to allow water to discharge outside of the balcony. Screed-to-fall will be done to ensure water runs out of the outlets, and that there will be no water ponding in any areas. 50x75mm Angle will be fitted where the door will be fitted to prevent water from running back into the rooms. The waterproofing application will consist of the following: x2 Coats of Mapei-Lastic Mapei-tape to all turn-ups and corners and into the cavities. Mapei-net the flat surface x1 coat will be applied, followed by the Mapei-net and Mapei-tape being applied on top of the 1st coat. 2nd coat will be applied over all of the above-mentioned after 24 hours. Aluminum doors and frames will be re-fitted. Turn-ups and bands around the frames will be plastered to a smooth finish. Waterproofing application and plaster will be left for x3 days before the painting and tiling can commence. New tiles will be installed.
Front part of new house needs roof installed. I have some trusses left that was also used in back part of house that is already installed. Approximately m2 left to be done right away. I have all the tiles already. House is in Mooivallei Park Potch. I need a roofing carpenter to ensure the job is done right. Additional m2 roof will be needed on second level but not urgent right now.
we have been renovating some of the house over the last couple of years, but we are looking to upgrade so that we can sell the house for more. upgrading includes a full renovation of the kitchen and scullery area, upgrading two bathrooms, replacing all the window frames and flooring, skirtings, fireplace, painting and stiling the 5 bedroom house.
Waterproofing to the balcony: Aluminum doors will be removed to the balcony. Aluminum doors and frames will be wrapped in bubble wrap and stored in the garage for safekeeping until re-installation. All cement and waterproofing layers will be chopped up and removed off-site from the balcony. Rubble skip will be on-site and removed once it is filled. All existing waterproofing will be removed. mm Turn-ups will be chopped off in order to apply the waterproofing application onto the bricks. Existing outlets will be removed. New 63mm Flange outlets will be fitted to the parapet walls to allow water to discharge outside of the balcony. Screed-to-fall will be done to ensure water runs out of the outlets, and that there will be no water ponding in any areas. 50x75mm Angle will be fitted where the door will be fitted to prevent water from running back into the rooms. The waterproofing application will consist of the following: x2 Coats of Mapei-Lastic Mapei-tape to all turn-ups and corners and into the cavities. Mapei-net the flat surface x1 coat will be applied, followed by the Mapei-net and Mapei-tape being applied on top of the 1st coat. 2nd coat will be applied over all of the above-mentioned after 24 hours. Aluminum doors and frames will be re-fitted. Turn-ups and bands around the frames will be plastered to a smooth finish. Waterproofing application and plaster will be left for x3 days before the painting and tiling can commence. New tiles will be installed.