I would like to renovate a house which will include new tiles in all but one room, new paint on all walls of the house, removal of bath and extension of the shower, new counters in bathroom and kitchen, removal of old wall tiles and adding new wall tiles repairing of the roof and ceiling maintenance.
The building is currently a standard 2 bedroom RDP house with a small lounge and small kitchen. The idea is to extend it (as need be) into a double storey 4 bedroom household. Included: bathrooms 1 main bathroom (shower, bathtub, basin and toilet) and a second smaller bathroom (shower, basin and toilet.) Included: bedrooms Three bedrooms 3x3 and one 4x3, all with built-in wood wardrobes. Included: outhouse To be extended into a modern 2 bedroom flat (design plan to be obtained from My domain Observatory, Cape Town) Please find attached the building plan for the outhouse extension.
We are starting with Solar Installation projects: The Ridge Casino and Hotel in Emalahleni. I would like you to price on the Civil work for the project. Please find attached the Footings Civil BOQ. Please change only the yellow cells in the Excel document. I have also included the info on for the Inverter station. Can you please price me on that as well please. Please feel free to contact me if you have any questions. Thank you.
1. Move a bedroom door to a different position in the wall, resulting in electrical socket also needing to move. 2. Change ensuite bathroom layout and change separation wall to full width, with alternative entrance. Layout to include shower, bath, toilet and, if possible, 2 basins. Plaster hole in the wall.
Want to extend the back of the house with two rooms, a bathroom and a laundry room. Need someone who can take a look at the plans and advise what they will charge. My wife is currently in the UK for work but she will be back next month and we would love to get the ball rolling as soon as she returns.
Move geyser from under kitchen sink to other side of the wall outside. + cover for the geyser. Restore kitchen cupboards. Remove old gas stove, not in working order for many years. Remove bath and change to walk in shower. Fan light to be replaced.Floor. +- 34sq m bachelor grond floor unit. Easy access.
My flatlet burnt down. I want to sell as is. the flatlet has two bedrooms and a huge lounge/ sitting room. I think its a great opportunity for a contractor to fix and resell. House prices in this area is high and sought after. They can come look and put in a offer. Huge pool and good borehole and irrigation
Ø PVC Soil and Vent Pipe 6m, Ø 50 PVC Soil and Vent Pipe 6m, x 55 x 95° PVC CE Anti-Syphon Horn Bend, x 50 PVC Eccentric Reducer, x 50 x 95° PVC PL Junction, x 95° PVC CE Junction, Ø PVC Holderbat, 50 x 95° PVC PL Junction, 50 x 95° PVC CE Junction, 50 x 95° PVC PL Bend, 50 x 95° PVC CE Bend, 50 x ° Bend, Ø 50 PVC Holderbat and PVC lubricant Soft
Quotation for SECURITY FENCE: AROUND NEW WATER TANKS 1. 18m - Supply and install 2.1m x 2.95m Fencing panels with 76x12 aperture and a 3mm on 4mm wire pattern. 2.7m x 76mm x 76mm 1.6mm square posts, cast with 15mpa concrete foundation mm x mm x mm (Include razor wire inside top and bottom of the fence 2. Supply and fit new pedestrian gate
- Location: [ office building, residential complex, schools.] - Area to be painted: - Walls (interior and/or exterior) - Ceilings - Trim (baseboards, moldings, door frames) - Doors - Windows - Stairwells (if applicable) - Surface types: - Drywall - Wood - Metal - Plaster - Number of coats: - Primer (if necessary) - 2-3 coats of paint (depending on color change and surface condition) - Color scheme: - Main color(s) - Accent color(s) - Trim color(s) *Services Included:* - Preparation: - Cleaning surfaces (power washing, scrubbing, etc.) - Filling holes and cracks with spackling compound - Sanding rough areas to smooth finish - Removing old paint, wallpaper, and border (if necessary) - Taping off trim, baseboards, and moldings - Painting: - Applying primer (if necessary) with roller or brush - Applying paint with high-quality brushes, rollers, and sprayers - Cutting in around edges, trim, and moldings with brush - Rolling ceilings and large areas with extension pole - Finishing: - Touching up mistakes and spills - Cleaning up drips and runs - Removing tape and protective gear - Disposing of waste materials *Materials:* - High-quality paint ( specify brand and type: latex, oil-based, etc.) - Primer (if necessary) - Brushes (various sizes and types) - Rollers and extension poles - Sprayers (if necessary) - Drop cloths and protective gear (tarps, plastic sheets, etc.) - Sandpaper and sanding blocks - Spackling compound and joint compound - Tape and masking materials *Timeline:* - Start date: we start on the day of commences - Completion date: we comply with the date of completion - Working hours: 8am-4pm, Monday-Friday] *Additional Requirements:* - Working around furniture and fixtures (if not removed) - Protecting floors and surfaces with drop cloths and plastic sheets - Ensuring adequate ventilation and lighting - Complying with safety regulations and standards