DRTechnical

Centurion
Electricians, Fences

Similar pros near Centurion

Other services in Centurion and surroundings

Recent requests

Wire mesh fence

  • City (or suburb) where you need the service: Noordheuwel, Krugersdorp
  • Fence length: 3 m
  • Fence height: 1 m
  • Will you be requiring installation?: No (supply only)
  • Do you also need a gate?: Yes, sliding gate

Electric fence

  • City (or suburb) where you need the service: Kenilworth, Cape Town
  • Fence length: 60 m
  • Fence height: 2 m
  • Will you be requiring installation?: Yes
  • When do you need this service?: I'm flexible

I am needing my current fence / wall / gate, to be made a "current" fence / wall / gate i.e. to have electrification added. I presently have a pair of swing gates but am open to convert to a sliding gate

Electric fence

  • City (or suburb) where you need the service: Laingsburg
  • Fence length: 1200 m
  • Fence height: 4 m
  • Will you be requiring installation?: Yes
  • When do you need this service?: As soon as possible
  • Do you also need a gate?: Yes, sliding gate

Wire mesh fence

  • City (or suburb) where you need the service: Benoni North, Benoni
  • Fence length: 200 m
  • Fence height: 1,4 m
  • Will you be requiring installation?: Yes
  • When do you need this service?: I'm flexible
  • Do you also need a gate?: Yes, swing gate

I also need two gates, at least 2.4m each

Certificate of compliance

  • City or suburb: Brits
  • Type of property to be inspected: Commercial property

Clearview fence

  • City (or suburb) where you need the service: Hartswater
  • Fence length: 34 m
  • Fence height: 1.2 m
  • Will you be requiring installation?: No (supply only)
  • When do you need this service?: I'm flexible
  • Do you also need a gate?: Yes, pedestrian gate

Home wiring/rewiring

  • City or suburb: Weltevreden park

I have a secondary DB board for a cottage. The cottage is fed either from eskom or my solar, but the cottage geyser drains the solar battery. There is a meter in the secondary board. The work I require is either to run a second wire from the main board to the second board for the geyer and have a second meter, or to take a feed from other circuits in the secondary board to feed some lights and plugs from the solar during load shedding - also requiring a second meter I think. Hopefully there is space in the board for a second meter. Then there is a circuit that is disconnected because it caused a leakage trip, probably due to a shared neutral, shared between the main and secondary boards.

Certificate of compliance

  • City or suburb: Zwavelpoort, Pretoria
  • Type of property to be inspected: House/apartment

Large house with Generator auto switchover and load limiting switch.

Certificate of compliance

  • City or suburb: Strand cape town
  • Type of property to be inspected: House/apartment

My property is up for sale and a offer has been put in and all i need is a qoute for electrical and water compliance certificate if there are any issues what it would cost and if theres a call out fee.

Home wiring/rewiring

  • City or suburb: Shallcross, Queensburgh

New wiring for a three bedroomed double storey house with lounge,kitchen ,two bathrooms,balcony and veranda 2×12w lights and three plug points per room