I have sample plan to serve as an example. We are planning to rent commercial property that we want to renovate and turn into a radiology medical facility. The property need to be renovated to have a reception area, a waiting area for patients, a kitchen for the staff, a lounge resting area, a room that with small single compartments to allow doctors and other staff to sleep/rest while working overnight/overtime and an office space for the staff We are looking at square metres to spare metre rented facility. I have uploaded 2 sample plans of the other testing radiology rooms. so it won't look exactly like tis plan, but these are samples of how we would like the facility to look like. I would like quotes, or an idea of how the entire renovation cost would cost us. the building material cost, and labour, just a rough estimate would be great thanks
Remove existing gutter and set aside for reuse. - Supply and install new 12x nutec fascia. - Reinstate gutter and align again. - Secure existing slipped fascia to both gable ends with nail-in anchors. In the front of the property and back. - Secure existing barge flashings with additional screws. - Check all existing roof screws torqued correctly.
QUATION OF 48SQM STUDIO ROOM KITCHEN BATHROOM OPEN PLAN CEILING AND DRYWALL ON TOP OF POLES 2.4M.HEIGHT FOR CAR PARK UNDERNEATH 5ALUMINUM WINDOWS X IBR ROOFING 2 to 4 ALUMINUM SLIDING DOORS PLUMBING AND ELECTRIC IS INCLUDED BACIN ,TOILET, SHOWER, ALL FIXED AND SUPPLIED PLUGS AND LIGHTS, WIRING DB BOX,SWITCHES FIXED AND SUPPLIED Something similar to the picture attached, but preferably not wood, steel, concrete, prefab anything else
2 toilets are running. I have to turn the water off to stop it running. 1 toilet is dripping at the pipe heading into the loo. The top element in the oven isn't working. Is this something you can look at? One recliner's mechanism is broken. Pull the lever and nothing happens Please send me a WhatsApp message before calling as I don't often answer foreign numbers.
Waterproofing to the balcony: Aluminum doors will be removed to the balcony Aluminum doors and frames will be wrapped in bubble wrap and stored in the garage for safekeeping until re-installation. All cement and waterproofing layers will be chopped up and removed off-site from the balcony. Rubble skip will be on-site and removed once it is filled. All existing waterproofing will be removed. mm Turn-ups will be chopped off in order to apply the waterproofing application onto the bricks. Existing outlets will be removed. New 63mm Flange outlets will be fitted to the parapet walls to allow water to discharge outside of the balcony. Screed-to-fall will be done to ensure water runs out of the outlets, and that there will be no water ponding in any areas. 50x75mm Angle will be fitted where the door will be fitted to prevent water from running back into the rooms. The waterproofing application will consist of the following: x2 Coats of Mapei-Lastic Mapei-tape to all turn-ups and corners and into the cavities. Mapei-net the flat surface x1 coat will be applied, followed by the Mapei-net and Mapei-tape being applied on top of the 1st coat. 2nd coat will be applied over all of the above-mentioned after 24 hours. Aluminum doors and frames will be re-fitted. Turn-ups and bands around the frames will be plastered to a smooth finish. Waterproofing application and plaster will be left for x3 days before the painting and tiling can commence. New tiles will be installed.
we have been renovating some of the house over the last couple of years, but we are looking to upgrade so that we can sell the house for more. upgrading includes a full renovation of the kitchen and scullery area, upgrading two bathrooms, replacing all the window frames and flooring, skirtings, fireplace, painting and stiling the 5 bedroom house.
Hi, I urgently need a quote please for some repairs on a property rental in North End. It's my moms property and she's battling with the tenant. Please let me know urgently if you can assist with a quote on repairs. Kitchen cupboards, counter top replacement, toilet seat replace, fix bedroom cupboard door, soap dish in bathroom ect.
Waterproofing to the balcony: Aluminum doors will be removed to the balcony. Aluminum doors and frames will be wrapped in bubble wrap and stored in the garage for safekeeping until re-installation. All cement and waterproofing layers will be chopped up and removed off-site from the balcony. Rubble skip will be on-site and removed once it is filled. All existing waterproofing will be removed. mm Turn-ups will be chopped off in order to apply the waterproofing application onto the bricks. Existing outlets will be removed. New 63mm Flange outlets will be fitted to the parapet walls to allow water to discharge outside of the balcony. Screed-to-fall will be done to ensure water runs out of the outlets, and that there will be no water ponding in any areas. 50x75mm Angle will be fitted where the door will be fitted to prevent water from running back into the rooms. The waterproofing application will consist of the following: x2 Coats of Mapei-Lastic Mapei-tape to all turn-ups and corners and into the cavities. Mapei-net the flat surface x1 coat will be applied, followed by the Mapei-net and Mapei-tape being applied on top of the 1st coat. 2nd coat will be applied over all of the above-mentioned after 24 hours. Aluminum doors and frames will be re-fitted. Turn-ups and bands around the frames will be plastered to a smooth finish. Waterproofing application and plaster will be left for x3 days before the painting and tiling can commence. New tiles will be installed.
Please I would like to have a quotation of a building that has a floor and ceiling that is damaged because of an air handling unit that is placed on top of timber floor. The ceiling below that floor is also affected. Please I would like to have the following in the quotation: 1. An investigation on the cause and extend of the water damage on the floor/ceiling. 2. On top of the timber floor there is a torch-on waterproof. What is the rate of the waterproof when it is removed and when it is replaced with new. Thank you. Kind regards,
plumbing a bathroom needs to be done over as it is an old steel bath where plumbing is not in wall but on the wall. tiles also need to be replaced. it will be a bath with a shower overhead, basin also be replaced. garage roof also needs to be done over the wooden strip on wall against which sheeting is mounted is rotting badly so whole roof needs to be done with most of the frame still being in excellent condition. poor waterproofing caused the rot. one face board on the main home also needs to be replaced. possibly would like the wall in front of home removed and replaced with solid sliding steel gate as well. this gate will be manual not motor based