Hi, can you please supply me with a quote. My bathtub pop up came out now using a normal plug, secondly a hairpin got stuck in the sink and now the pop up plug won't come back up, thirdly my toilet after filling up the water continues to drip into the toilet, but now it is much more than dripping, I tried closing the water supply to the toilet, but even fully closed it keeps on running. Can you please help with a quote, thank you. You can email me at the email address above.
Its a project which i will need to sub contract proper company that does sewer and plumbing manatainance service since i have quite few projects panel sometimes I'm tasked to do or produce RFQ within panel projects won already. See attachment of shot BOQ I have sent Quote with Company letter head and contacts so that when ever I have I don't want to struggle
I need electrician to install a backup power system on a house. All components: batteries, inverters, wires, connectors ect will be supplied. The batteries and inverters will be installed in the garage of the house, power will run from the main db board to the inverter to charge the batteries, then back out from the batteries to the inverter to the db board into the house. When power to the house from the municipal main line cuts out the power from the batteries will kick in and power the house. Expectations: clean and maintainable job needs to be done, the work will be inspected afterward and any necessary changes will have to be made, safe and maintainable work is of priority.
-replacing shower frame (the doors dont open and close properly so they say the frame needs replacing.. or whatever can be done for doors to open and close). - unblock toilet( note it's not outside drains that has a problem ..all other drains are fine, just toilet). -leaking shower copper pipe on roof. PLEASE CONTACT ME VIA EMAIL ONLY, I CAN'T TAKE CALLS AT WORK
In summary the main specs are: a. 34 x wiring to new lights (mostly downlighters, some external wall mounted) b. 16x wiring to plug points (std double plug) c. 1x oven Isolator, wiring 32 amps d. 1x hob isolator 20amps d. 3x air con points, isolator 15 amps e. 7x switch points f. 6 x switch points 2-way g. "making good" on and integration of existing My own diagram of the job, if this might be useful for the purpose of quoting.
Install 2 x double socket plugs (supply feed to come from back to back plug thru wall into new plug socket nr 1, and extend +/- 1.5m to 2nd new plug socket) Install 1 x light switch (3 x lever) Install 1 x new light fitting inside built in braai (with +/- 1.5m silicone wire to light switch) Wire and connect to existing connector box (+/- 6m wire) - with power supply already available in connector box for lights.
Separation of my sewerage pipe from the neighbors' sewerage pipe as I always have drain blockage whilst I'm not suppose to because I'm mostly not around and things that comes out from the drain she agrees that are from her side, she's got more than 15 foreign tenants I have none but I'm the one suffering
Toilet-My two toilet are forever dripping water and as such waste a lot of water...Bathtub-The hot water pressure on my bath tub is too small and takes forever...Sink-My two sinks stoppers when pressed down to stop water from escaping the sink could not come back to their original position.Water stays long in my sinks and takes forever to go out. Send me the quotes via email, please. It can be done on Monday also.
Installing electricity from scratch in a 6 roomed house with a toilet( seventh room) The dB will be in a kitchen. The lounge will have 2 plug points and 1 double switch, the kitchen will have 3 plug points and 1 double switch. The main bedroom will have 2 plug points and I switch. The second bedroom will have 1 plug point and 1 switch. Third bedroom will as well have 1 plug point and 1 switch. The fourth will have 1 plug point and 1 switch. The lounge will have 5 dull lights. The kitchen will have 6 dull lights. Other rooms will have each normal lights.
QUOTATION ON 12M CONTAINER TO WIRE COMPLETELY 1 X ROOM : 1 X DOUBLE WALL PLUG WITH USB : 1 X SINGLE LIGHT SWITCH : 1 X CEILING LED POINT OPEN PLAN LIVING ROOM AND KITCHEN : 2 X LED CEILING POINTS : SPLIT UNIT AIRCON POINT : SPLIT UNIT AIRCON INSTALATION : 2 X DOUBLE WALL PLUGS WITH USB : 2 X DOUBLE WALL LIGHT SWITCHES : DB BOX : 2 X OUTSIDE LED POINTS BATHROOM : 1 X LED CEILING POINT : 1 EXTRACTOR FAN CONNECT : 1 X 50 L GEISER POINT TOTAL WIRING WITH ELECTRICAL SERTIFICATE TOTAL SQ METER 30 Can you provide me with 2 quotes on labour only I supply everything and if you supply all materials.