Electric Fence Entire Perimeter m 8 Strand Wall top electric fence 50 8 Strand Square Tube Brackets (1 every 3m) 1 Energizer 1 Lightning Diverter 1 Siren HT Cable - Slimline Ferrules 6mm/ 48 Tensioner - hybrid Comp spring 48 Spring Hooks 17 Warning signs - small double sided every 10m Aluminium Wire 1.6mm 8 Earth Spikes, every 30m, 3 at energiser for each zone 80 Wall anchors 5m Conduit,connectors 1 Gate Contact Installation
I require someone to perform the following: 1. service and purify my oil transformer. Specs: Kva, 3.3kV/V, DY11 I also want to enquire about rates for labor when installing a standard V DB Box (All material supplied), this box feeds 3 pumps Lastly, I would like to enquire about labor rates to perform faultfinding. Pump is in working order but does not work
1. Energizer with keypad . square tube brackets 8 lines 18- Stays mm with lugs 18- Stay clamps 5-Braided wire stainless steel 1.2mm 3- HT cable slimline black 5- Ferrules 6mm per - Tension springs 2- Spring hooks 50 per pk 2- Standard gate contact 20- Warning signs 12- Earth spikes 2- Lightning diverter
Good day. The property is m right round there are 2 motor gates. The garage is not attached to the house. The distance from where the Energizer would be mounted up to the fence is 10 meter. There are enough soil for earthing. The property fence wall is made of rock and cement. The front fence has pieces of palisade devils fork of 2,5 m each for the whole length of 56 meters. The property consist of 4 corners. The property is a Square. Xtras needed: A remote panel to reset the alarm would be good. A siren as well as a strobe light. An indicator light(LED) showing the electric fence is armed.8 Strand electric fence.
Dear Sirs, We are in need a of gate for a corridor from a church to the manse. It would perhaps be a special measurement, but would have to be full height. We would need to lock this gate. The most important is whether you would be able to install it on the 19th March, for reasons I can explain when you contact me. Thank you for your consideration, . +
Knowledgeable person to come and do site inspection. New extension (36 m) from existing electric fence is required to be installed on top of newly installed palisade fence, with gate on street front. Connection is to be from existing energizer. Repair one or two broken earthing pegs. Assess the general condition of existing segments of electric fence. Provide a quote that specifies cost items and labour. It would be greatly appreciated.
Knowledgeable person to come and do site inspection. New extension (36 m) from existing electric fence is required to be installed on top of newly installed palisade fence, with gate on street front. Connection is to be from existing energizer. Repair one or two broken earthing pegs. Assess the general condition of existing segments of electric fence. Provide a quote that specifies cost items and labour. It would be greatly appreciated.
Five room with double garage and bathroom kitchen with two separate single plung and sitting room with two separate single plung the other three rooms each with single plung ten outside lights one plung in garage and bathroom and isolator for stove eah room with single switch and two passage switch and light in veranda
Replace a wooden door between front and back garden. I live in a complex. Want to install a steel/metal black gate with frame. Door must be able to lock. It looks as though the door that is being replaced is a standard size internal door. You must not be able to see through the door, in other words the door must be a solid panel.
I need electrician to install a backup power system on a house. All components: batteries, inverters, wires, connectors ect will be supplied. The batteries and inverters will be installed in the garage of the house, power will run from the main db board to the inverter to charge the batteries, then back out from the batteries to the inverter to the db board into the house. When power to the house from the municipal main line cuts out the power from the batteries will kick in and power the house. Expectations: clean and maintainable job needs to be done, the work will be inspected afterward and any necessary changes will have to be made, safe and maintainable work is of priority.