The house to be built is about square meters. I already have the plans but I need your e mail address to forward it to you. The project would be in Hermon, 24 km from Wellington and 30km from Malmesbury. On this plan we need the IBR sheeting to be one whole length sheet of say 1,5 meter wide and 19 meter long. Is such an animal realisable or do I have it miss. work on the complete roofing for this house. Thus kindly send me your e mail and you will then get the plan to compile your quote. Thanks.
Require a carport structure to be erected next to a braai room in my backyard. Material (steel sheets, steel lipped channel purlins, steel flashing and steel poles) are on site. The area to be covered is 6.25 x 3.45. The contractor must be able to erect steel carports, have a welder as part of his team and have power tools to cut steel purlins, steel sheet and steel poles. Roof structure requires welding.
The water is getting under the belcony tiles which has caused dampnest of my wall and the paint is pealing off. It's only 6sqm the tiles has to be removed, and torch-on bitumen applied then re-tiled. I want it done as soon as the walls and the belcony has dried completely. Because the last guy that did it said it would last 10 years and it's not even 6, the second picture is to show the state of the walls directly below the belcony. Apologies for my tone but I'm drive texting I won't have time later to do this. But you can send me the qoutes incase I'm unable to answer when you call as my days are usually extreme. Thanks so much for your time.
What we need is to have a comprehensive quotation: Stating the flow/project steps to be followed: I.e. Removal of old strips; preparation (type); application (process), around washing lines?; against parapet walls; securing of edges on sides of parapet walls; stormwater downpipes. stating the type of product (pamphlet/info brochure) to be used, the guarantee provided on the workmanship and on the product, the required annual/other running maintenance required the expected project time-frame OHS plan and requirements to ensure safety References & contact details This will include the entire roofed are, incl. balcony tops, store rooms & tops, and all parapet-wall tops on roof.
I Have 2 x adjoining room spaces with existing concrete slab roofing Approximately 90sqm in total. When i say slab i mean, this was not done to standard by the looks of it. When it rains it leaks and varies probably between 50 - mm thickness, butt brittle as it can be. Bought this house as is. Concrete is cracking and breaking off and pieces fall down. I would like to replace the concrete roofing with IBR sheeting. Need a new registered with Municipality drawing for the change and also would like to break through one wall which already has plinth supports in (this was a large window previously it seems). We will do the breakout and build with our own contractor.
1)Sika Cemflex reinforced waterproofing on 'Cemflex' membrane or simmilar approved applied in strict accordance with manufacturers details including waste (35m2) 2) One layer of DERBIGUM SP 4mm fully sealed to deck by torch on fusion or coldbond 90 ADHESIVE SPREAD at the rate of 1-3sqm per Litre depending on absorption of the surface. Side laps at 75mm and end laps at mm sealed together by torch on fusion. Vertical and horizontal turns should be fused to the primed surfaces; angles; outlets fillets and flat edges. All as recommended by DERBIGUM (m2) 3)Two coats of co polymer or bituminous aluminium paint (m2)
We're purchasing a home in Westdene and a general home inspection revealed some defects in the roof. We'd like a specialist to inspect and advise on the extent of the defect (how critical it is), give options on fixes and estimate the cost of fixing it. This is quite urgent (we need this done by Wednesday next week).
Hello I've got the metal roof that still needs to be redone and I'm not sure what type of roof is inside the house it's a normal roof white but I think water somehow went into the roof now it's just sitting there and causing my lights not to work and there's a leak next to the light bulb holder. I just need a quotation to see more or less how much it would cost to repair it.
After 1-2 days of continuous rainfall in our area water has somehow penetrated one section of our tiled pitched roof on the eastern side of our house and dammed up in a pool about 1 square meter wide on the inside of the lounge ceiling below from where it has saturated the surrounding ceiling board and dripped through nail holes into the lounge.
Waterproofing to the balcony: Aluminum doors will be removed to the balcony Aluminum doors and frames will be wrapped in bubble wrap and stored in the garage for safekeeping until re-installation. All cement and waterproofing layers will be chopped up and removed off-site from the balcony. Rubble skip will be on-site and removed once it is filled. All existing waterproofing will be removed. mm Turn-ups will be chopped off in order to apply the waterproofing application onto the bricks. Existing outlets will be removed. New 63mm Flange outlets will be fitted to the parapet walls to allow water to discharge outside of the balcony. Screed-to-fall will be done to ensure water runs out of the outlets, and that there will be no water ponding in any areas. 50x75mm Angle will be fitted where the door will be fitted to prevent water from running back into the rooms. The waterproofing application will consist of the following: x2 Coats of Mapei-Lastic Mapei-tape to all turn-ups and corners and into the cavities. Mapei-net the flat surface x1 coat will be applied, followed by the Mapei-net and Mapei-tape being applied on top of the 1st coat. 2nd coat will be applied over all of the above-mentioned after 24 hours. Aluminum doors and frames will be re-fitted. Turn-ups and bands around the frames will be plastered to a smooth finish. Waterproofing application and plaster will be left for x3 days before the painting and tiling can commence. New tiles will be installed.