I have 2 wall sharing outbuildings. I would like 1 of the unit to have plumbing and electric completed. The plumbing pipes are already in place, just need connection in bathroom. Electricity needs to be pulled from main house to outbuildings. Then interior will need cementing in bathroom and main room(bachelor unit no walls besides bathroom). Roofing is in place, it's corrugated. Will need ceiling.
I have 2 wall sharing outbuildings. I would like 1 of the unit to have plumbing and electric completed. The plumbing pipes are already in place, just need connection in bathroom. Electricity needs to be pulled from main house to outbuildings. Then interior will need cementing in bathroom and main room(bachelor unit no walls besides bathroom). Roofing is in place, it's corrugated. Will need ceiling.
We require someone to do electrical cable runs under the ground around a property (property size Dual Ducting along route for our fibre line. We will need 3 outdoor plug points in a outdoor enclosure (enclosures to be provided by you) V at all 3 points, including the guards room. We are also looking for someone to lay Fibre with 18 Fibre splicing at each camera post.
Fault-finding, Repairs and installations: 1. 2 inside lights (fault finding and repair) 2. Installation of a 60A circuit breaker on the main DB 3. Installation of an 8 way sub DB 4. Running a m surfix cable disconnecting the existing cable from the current nodal point (Underground including wire ways -pvc conduit) 5. Replacing 1 single pole - 2 lever switch. 6. Rewiring of 1 single pole switch - 2 lever switch. 7 . 2 outside floods lights (fault finding and repair) 8. Installation (light circuit and socket outlet) at the guard house. 9. Installing 10 photo cells on the existing circuitry
Fault-finding, Repairs and installations: 1. 2 inside lights (fault finding and repair) 2. Installation of a 60A circuit breaker on the main DB 3. Installation of an 8 way sub DB 4. Running a m surfix cable disconnecting the existing cable from the current nodal point (Underground including wire ways -pvc conduit) 5. Replacing 1 single pole - 2 lever switch. 6. Rewiring of 1 single pole switch - 2 lever switch. 7 . 2 outside floods lights (fault finding and repair) 8. Installation (light circuit and socket outlet) at the guard house. 9. Installing 10 photo cells on the existing circuitry
Advice & quotation for full installation. I don’t know how many AC's I will need. Have quite a large house so need professional advice. My house has an approximate floor area of m2 downstairs & an open mezzanine of about 70m2. Half the downstairs & the full upstairs are open plan. The other is normal rooms.
This is home which we are purchasing. We intend to install solar once the bond is registered (we plan on doing the installation early in January). We do not currently have electricity usage, as this is a bigger home than we are used to. We would like an 8kW inverter, even if solar panels and battery are smaller, to allow us to upgrade if needed without installing a new inverter. A few options, ranging from R -R would be great
Please quote 2 x units 60 m2 each on same stand. Face brick. 15 degree flat roof zinc. Aluminium windows and doors. concrete floors polished. tiled bathroom walls. Open shower flat on floor. Vanity and toilet. Plastered inside walls. Plastered ceilings. Down lighters. Electricity change over switch for generator. Covered patio. Gas hob 4 plate no oven. Wooden kitchen units, granite tops. Plumbing to connect gas geyser. will need to chat around finishes. I need a quote for my budget to present.
I bought a townhouse in a complex and there are two bathrooms and the kitchen to be renovated. I want the tiling, taps etc. to be removed completely and replaced with whole new designs, this will be for the bathrooms and kitchen. I will then finally need the entire inside of the house to be painted. I am not sure at all about the total sqm of the house. Would need someone to advise.
Please contact me asap. I require the following. 1-off 8kw Sunsynk Inverter, 2×5kw Sunsynk Lithium batteries, 8 × watt mono crystal Canadian or JA Solar Panels. DC Connection/Protection box, AC Sub DB, Surge Pro, Changeo er, Indicators, DC DB, Combiner 3-1. Alternative quotation required for the above but Victron product and Lithium (LiFePO4) Batteries. Need a CoC as well.