Redisign, knock down walls
Bathroom renovation: Remove existing bath, basin and toilet pan Repair 40ml drainage pipe (leak) Install new close couple toilet pan to new position Install new vanity Create new shower base Install new drainage for shower Waterproof shower base Install new shower taps and shower head Install new shower screen TILING Remove wall and floor tiles Primer walls Tile 20m2 walls Tile 2.5m2 floor Tile 1.2m2 shower floor Remove all rubble
Home wiring
Add another 4 rooms, including deck
Want to install DB, maybe 6 socket outlets, and then connect DB to an inverter
Remodeling the existing toilet,we have bought the material,all we need is labour.
Complete bathroom renovation including fitting of new sanitary ware, plumbing, all taps, shower fittings, etc