I recently installed a jojo tank where the builder placed the pipes underneath a concrete slab but the conrete ended up in the pipes thus blocking it. I would like to relay a small portion of the pipe which directly comes out of the jojo tank and also lift the pump by 30cm. We will have to use a angle grinder to get the pump out.
The building is a 2 bedroom, open plan lounge, kitchen, prayer room, bathroom & toilet, ensuite cottage with a heap roof built alongside the main building. It's a complete project from scratch. URGENT
I am looking to build a 4 bedroom house, 2 bathrooms, a garage as well.
warehouse damaged during looting
Building of 20 houses on vacant land (not prepared) - 4 hectares
I require a septic tank to be repaired at the Eskom power station
I would like to build a butterfly roof house with 4 bedrooms 2 lounge areas 1 dining area Double garage 2 bathrooms Main bedroom with ensuite / walk in closet
I am not % sure about the measurements and the approximate size that I need the property to be. Someone will be coming by the property today to measure properly so I will be able to give proper measurements soon.