Recently had a Mercer inverter installed. Can't understand why green light stops and goes on all the time. This is the 2nd set of batteries he got for me. He doesn't get back to me. I am on pension and have been badly let down and taken advantage of. I cannot afford to pay a large sum of money for a call out. I just need advice please. Deeply disappointed and depressed about the matter. This is not what i bargained for. Thank you.
Afternoon , I do have a project which is supposed to start any time soon its a ground floor with a story on top of the double garage part and the lounge dinning and kitchen part. So it will be having 3 bedrooms on the ground floor 2 will be having ensuites ,a study room, separate bathroom and toilet and also an outside toilet On the first floor is, main bedroom with ensuites and separate toilet , lounge and the veranda part with palisades. In short...
An electrical installation is a group of items of electrical equipment that are permanently electrically connected together and can be supplied with electricity from the works of an electricity entity or from a generating source. An item of electrical equipment may be part of more than 1 electrical installation. Steps to Install electrical distribution board You must have to install the feeder pipe at first. If you're using metal pipe, place a plastic bushing over the connector threads. Using a tape, pull the electrical feeder wires through the feeder pipe. Leave enough wire to get to the opposite side of the panel.
Would like to have an idea of what it will cost to build a simple rectangular shaped house using blocks and IBR sheeting roof, exposed inside roof using poles, concrete "stuco-type" floor throughout. WIDTH - 14 meters wide consisting of 8 meters internal living area, plus 4 meters front patio., plus 2 meters back patio. LENGTH - 25 meters completely open plan for kitchen with laundry and pantry, dining room, lounge (all open plan), and four bedrooms in the last 12 meters
Good day I am looking for quotes for an electrician to wire a new house with the following scope of work: - Issue COC once job is complete - Connect power from mains to the DB - Wire the DB - Secure all wiring in conduit - The following will need wiring: - About 25 plug points - 1 stove isolator - About 20 lights and light switches Thank you Regards
I would like some residential work done. 1. Remove a current chandelier light fitting and replace with a light and fan fitting. 2. Remove a side light fitting - do want to use anymore 3. Check wiring of the above - current chandelier lights tripping 4. Replace one light with another light 5. Fix a faulty light, switches on but goes off after a while.
walkways and access to flats on three levels need restoration of waterproofing and sealing with jotamastic and hardtop flexi or similar Diamond-grind the walkway in order to profile the surface in preparation for coating, Sand the skirting, Cut open all cracks in the walkway and backfill them with Hybriflex or similar , Rebuild with Smooth ’n Patch or simial, remove all hollow/disbonded topping-screed and repair the areas with Smooth ‘n Patch, , Prime all repaired areas with a two coat system of Jotamastic 90 followed by a two coat system Hardtop-Flexi, or similar
kitchen, 2xbathrooms (1 with shower and 1 with bath), add wall to enclose 3rd bedroom again. that is needed. Would also like a quote on opening up a load bearing wall about 4m x 2m, this used to be the outside wall so would also be a firewall if I am correct. the room behind that would need the floor raised and if possible the ceiling as well, else we will extend this to be the living room/tv wall
Whole roof underlay to be replaced with superior quality, temperature controlling material. Valley messed up by previous builder to be fixed. Considering to have parapets knocked off as they have always leaked, resulting in interior damage to steel door frames, etc. Patio to be changed into a room (roof, ceiling and aluminium sliding doors). Flat roof of braai room to be changed to a pitched tile roof like the rest of the house with sliding doors and windows(for better ventilation), overlooking the swimming-pool. 3 x Bathroom makeovers In the middle of the tandem double garage is the parapet wall which hosted the previous two steel roll-up doors. This complete wall must be removed, but then the trusses of the front garage will need support over a distance of about 7m. The complete garage needs a ceiling. The raw cement floor needs levelling and either epoxy coted, tiled or painted. There are a few minor jobs, e.g. removing rusty steel doorframes, cracks in walls and ceilings, damp problems, replacing a few windows and doors, erecting concrete platforms for water tanks, etc. Electrical changes and additions will of course be needed.
Hi, I would like the verge around my property paved if within budget. Im keen on cobblestone pavers, but open to a more budget friendly option. It's hard to keep people from parking on this area, but if they do it's needs to be able to withstand a car. I would like little maintenance on this paving. Currently there is lawn, so in the long run would paving save me money than maintaining a lawn.